Product sourcing details

Place of Origin
China

Supplier: Jiuzhou Pump Pipe Manufacturing Co., Ltd.

Purchasing information

Minimum order
1
Lead time
15 Days

Please confirm with the supplier: Model / reference, Key specifications / compatibility, Samples, Export markets, Supply capacity.

Manual Concrete Placing Boom
The Manual Concrete Placing Boom includes supporting steel pipes, pipe supports, pull bars, a beam.etc.Installed on the slewing supporting holder
  • Description
  • Model
  • Performance
  • Application
TheManual Concrete Placing Boomincludes supporting steel pipes, pipe supports, pull bars, a beam.etc.
Installed on the slewing supporting holder, the main beam frame can rotate 360°. Pipe supports on the front beam are used to fix and support delivery pipelines. The balancing frame on the rear beam is installed to achieve the balance.
The Manual Concrete Placing Boom series is structurally stable and reliable, operationally portable and flexible.

 ModelHGS-10HGS-12HGS-15HGS-18
Reach, m10121518
Area, ㎡2604506001000
Height, m444.55
Pipeline Dia., m133*4.5133*4.5133*4.5133*4.5
Overall Weight, kg900100012001500
Arm A Rotation, °360360360360
Arm B Rotation, °350350350350
Operating Weight, kg5006508001000
  • Company: Jiuzhou Pump Pipe Manufacturing Co., Ltd.
  • Country: China (Mainland)
  • Founded Year: 1998
  • Contact: Guoxing Gao

Jiuzhou Pump Pipe Manufacturing Co., Ltd.

Enter between 20 to 3,000 characters. English only. Characters: 0 / 3000
submiting now We do inquire for you, please wait...