Quick Information Place of Origin China 18*16 120g 34%fiberg 70000 sqm per day Description Fiberglass screen is weaved by single PVC coated fiberglass,after the heat treatment, the mesh is clear and stable, and has good capacity in ventilation and transparency. It has the capaci
Wuqiang county huili fiberglass co.,ltd. [2017-10-13 11:02:34 ]
The utility has the advantages of high universality, adaptability to different layers of the cast in situ reinforced concrete transverse structure template engineering. Installation ,dismantling and transportation are very convenient, high supporting and dismantling speed, the sa
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-13 10:36:16 ]
cantilever formwork system is typically used for road and bridge piers, underground engineering construction column building, which surface does not have any straining beams and components. Cantilever climbing formwork system mainly consists of a cantilever frame Assembly, templa
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-13 10:35:44 ]
Construction of large volume concrete of hydraulic climbing mould mainly be used in hydro-electric projects, primarily water Dam spillway tunnel outside, inside, and other buildings, which mainly consists of bearing frame, template system, supports , and hydraulic systems. Templa
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-13 10:35:16 ]
Sliding box mold technology basic kept sliding mode technology promotion way and construction unit, So both the advantage of sliding mode, matching equipment such as continues rapid construction, finalize the design is simple and reliable, save the scaffolding, convenient operati
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-13 10:34:33 ]
When construction building’s height is high, and its the horizontal and vertical structure are constructing at same time, the regular distributor where located on the surface of rebar will affect concrete work. But the Distributor large-load hydraulic auto-climbing formwork pla
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-13 10:33:53 ]
Lift-well hydraulic lift mode platform was mainly used into the construction of core tube structure. when the relative well hole part of horizontal structure is more, in order to reduce the construction period and costs, the hydraulic lifting formwork construction method shall be
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:06:16 ]
Joined silo is common large production capacity storage for cement plant or grain storage, which mainly categorized in various join-type of 8, 10, 12, 16, 20, 24, 28, etc. This structure is carried out through the sliding frame platforms and connections between the lifting frame,
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:05:39 ]
Large diameter silo hydraulic construction mold is mainly used for cement warehouse, power plant storage of coal fly ash warehouse. The shape of the building is round, the diameter of the building according to the storage capacity of the rules of the building on the construction.
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:05:01 ]
Chimneys usually erected in power plants, cement plants, chemical plants, it’s mainly circular column shape, The external diameter is also reduced and changed with height. So, chimney’s construction work should be built by practical hydraulic lifting template system. The main
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:04:22 ]
Integrated intelligent lifting scaffolding is a new technology in the construction of high building scaffolding, and can also be divided into an independent lifting unit according to the construction section, economy and practicality, and fully meets the requirements of construct
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:03:42 ]
Working inside of the formwork keeps the workers safe. With integrated all-steel and fully enclosed structure and the galvanized hole punched mesh, the formwork looks tidy and fireproofing. Installation and adjust floor by floor, the deviation will be absorbed in next floor, so t
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:02:47 ]
Electric lifting platform mainly included simple platforms and cables which combine with climbing formwork and lifting system, and it’s use principle are similar with climbing structure. This unloading system is small-tonnage platform that is mainly working for construction of
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:02:03 ]
Hydraulic unloading platform, a major role in the core of concrete structure parts, which cooperates with hydraulic climbing formwork system. When core tube’s vertical and horizontal structure are constructing, climbing formwork for core-tube’s vertical structure template sys
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:01:05 ]
Hydraulic lifting system including hydraulic control unit, lifting jack and component. Different types of lifting equipment shall be applied as per the essential requirement. Hydraulic auto-climbing formwork usually selects HY-36,HY-56 hydraulic units. QYD wedge jack, GYD60 ball
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 18:00:25 ]
Composite steel formwork is a tool type template, It is the use a template form most of the engineering construction. It is composition of modules certain types of plate, angle mould, supporting and connecting piece. It can be used to spell out a variety of sizes and shape, need
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 17:59:48 ]
The form sliding work of Civil construction,with frame, scaffolds, templates and lifting equipment. Firstly,the top silo/building was assembled on slip-formwork support according to its design location The inclined beams that supported the top silo was supported by profiled steel
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 17:59:09 ]
Aluminum alloy formwork system includes a set of templates with the advantage of simple and convenient assembly for any engineering or building construction. . The maximum surface is 400mm, the average weight of 25KG/m2, entirely artificial assembly, do not need any mechanical eq
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 17:58:28 ]
Products mainly design and manufacuturer of building bridges with templates,including tunnel, T-beam template, box girder template, Composite steel formwork is a tool type template formwork. It comprise a modules certain types of plate, angle template,supporting pieces. variety t
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 17:57:45 ]
Climbing around building structure distribution agencies, attached to the wall or installed on the structure that can withstand the load on the beam, attached to the wall to hang a installation guide on the roller and frame body connected to the electrical hoist which installed o
Jiangsu Wanyuan Formworks&Scaffold Engineering Co.,Ltd [2017-10-12 17:56:52 ]