East Borneo Coal

 

Workingcondition          : royalty, paying ?usd/ mt including all cost until mother vessel, like ; fee minig, fee road, feeloding port.

Deposit                                : estimate only20 million mt.

Areacondition                  : buying land  1000-3000 usd/ hektar for minig area.

Permitions                         : only mining areapermition .

Stock pile                            : sea side  , draft until 30 m , 40 000 mt mother vessel can load.

Coalcondition                   : coalthickness 2-10 m, 1/5 SR, Over bording 2-5 m, GCV 6100- 6300, Total Sulfur 0,5-1,8 , Volatile matter 38-46, HGI 41- 55, two kind coal formation , DIP 5-20degree .

Roadcondition                 : holing road 35km direct to sea side and loading port owner is same .

Far from sea                      :35 km

Total area                           : 3500 hektar X 3

Total area: 3500 hektar
Far from sea: 35 km
Road condition: holing road 35 km direct to sea side and loading port

  • Surface Handling:Heat Transfer Printing
  • Model Number:005
  • Brand Name:BERAU
  • Place of Origin:Indonesia
  • Country:Indonesia
  • telephone:62-81-370129334
Surface Handling: Heat Transfer Printing
Model Number: 005
Brand Name: BERAU
Place of Origin: Indonesia

PT. HASS COAL

Enter 20 to 3,000 English characters. Characters: 0 / 3000

Submitting We are sending your inquiry, please wait...