Cationic Asphalt Emulsion Rapid Setting (CRS-2)

Double Surface Treatment Constuction
  2.1 The methods for Prime Coat constuction and sprinking pebbles do the same way as Single Surface Treatment construction,you can see the procedure no.1.1-1.8 above.However,you must use CRS-2 about 1.2-3.3 litre/metresquare.
  2.2 After finish constructing Prime Coat,paving and levelling down pebbles on the first level surface,blow off all the dust.Then paved the surface with CRS-2,50-85 c , about 0.5-1.5 litre/metresquare.
  2.3 Clean the first-level surface by sweeping pebbles or pebbles which get loose or remain on the surface.After that blow off the dust and pave with CRS-2,50-85 c , about 0.5-1.5 litre/metresquare.
  2.4 Scatter pebbles,size 3/8 niche (9.5 mm.),about 7-11 kg/metresquare to cover the surface immediately. The next steps,follow the same instruction for Single Surface Treatment construction.
3. Tack Coat
  3.1 Clean the surface by sweeping all dust and materials that got loose.
 

3.2

  • Country:Thailand
  • telephone:66-0-3222-2667
The methods for Prime Coat constuction and sprinking pebbles do the same way as Single Surface

Zola Asphalt Co.,Ltd.

Enter 20 to 3,000 English characters. Characters: 0 / 3000

Submitting We are sending your inquiry, please wait...