Transformer OLTC On Load Tap Changer Analyzer

Transformer OLTC On-load Voltage Adjustment Switch Characteristics Tester On Load Tap Changer Analyzer INTRODUCTION: It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...

Come From GOLD

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester INTRODUCTION: It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. PAMAMETERS: GDKC-2000 ...

Come From GOLD

On-load Regulating Transformer

The on load transformer company:YueBian Electric Co.,Ltd ...

Come From Yuebian Electric Co.,Ltd.

SZ11 Type 10kv Series On-Load Regulator Transformer

General introduction This maximuim on load transformer Environmental conditions: 1.Type:Outdoor 2.Normal Service Conditions: 3.The height above the sea level is below 1000m; 4.Ambient temperature: Highest air temperature+40 ℃, Lowest air temperature-25℃ 5.Relative air ...

Come From Yuebian Electric Co.,Ltd.

SFZ11 Type 35kv Series On-Load Regulator Transformer

General introduction of on-load regulator transformer: This three phase distribution transformer Environmental conditions of on-load oil immersed transformer: 1.Type: Outdoor 2.Normal Service Conditions: 3.The height above the sea level is below 1000m; 4.Ambient temperature: ...

Come From Yuebian Electric Co.,Ltd.

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

1.1 General introduction The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...

Come From 重庆格纳迪机电设备有限公司

Transformer Load and No-load tester GDKF

1.1Function Measure the transformer load current, load loss, short-circuit voltage, short circuit (load) losses. 1.2 Test Item RMS phase voltage Average value of three-phase AC voltage Three-phase current RMS Percentage of no-load loss and no-load current: Load loss, impedance ...

Come From 重庆格纳迪机电设备有限公司

GDKC-2000 Transformer On Load Tap Changer Tester

GDKC-2000 Transformer On Load Tap Changer Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and three ...

Come From ChongQing Gold Machine& Electric Equipment Co., Ltd.

GDKF Transformer Load Tester and No-load Tester

GDKF Transformer Load Tester and No-load Tester I. Function Measure the transformer load current, load loss, short-circuit voltage, short circuit (load) losses. II.Test Item RMS phase voltage Average value of three-phase AC voltage Three-phase current RMS Percentage of no-load ...

Come From ChongQing Gold Machine& Electric Equipment Co., Ltd.

GDKC-2000 Power Transformer Tap Switch Tester

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and ...