7)7500-7000m2 will go into a 40'HQ container
6)Lead Time:7 DAYS
5)Packing:Plastic Bag
Specification and Feagures:
1) Roll Length: 11m,13.725m
2) Roll Width:1.1M, 1.37m&1.83m
3) Thickness: 3/8 inch,7/16inch,1/2inch
4) Compound Material:Crepe Paper,Non woven and PE etc.
1.UNDERLAYMENT CAN EXTEND THE LIFE OF YOUR CARPET,
2.IMPROVE UNDERFOOT COMFORT
3.MAKING YOUR HOME QUIETER
| Delivery Time: | 10 DAYS AFTER RECEIVED THE DEPOSIT |
| Package: | ROLLED UNDERLAYMENT ARE TO BE PACKED IN A PLASTIC BAG |
| Supply Ability: | 20,000 Square Meter per Week |
| Minimum Order Quantity: | 5000 Square Meter |
| Payment Terms: | T/T |
| Port: | SHANGHAI |
| Fob Price: | US$1.00-1.50SHANGHAI |
| Product Material: | Polyurethane Foam |
| Pattern: | ROLLED PU UNDERLAY |
| Technics: | BONDED PU FOAM |
| Function: | Thermal Insulation |
| Usage: | Commercial |
| Model Number: | 100D-9mm |
| Brand Name: | SHENXIA UNDERLAY |
| Place of Origin: | Shanghai China (Mainland) |