4.Paint:NC S 0502-Y / Waterbase painting
3.Base Material:Chinese Fir,Pine
2.Standard:E1 standard
1.Three Part with Bottom part
Door Frame
Door Frame
1.Three Part with Bottom part
2.Standard:E1 standard
3.Base Material:Chinese Fir,Pine
| Delivery Time: | 20 days upon receipt of deposit |
| Package: | as customer's required |
| Payment Terms: | L/C,T/T |
| Model Number: | SE-D |
| Brand Name: | OEM |
| Place of Origin: | China (Mainland) |