Double Wall Corrugated Pipe Production Line
1,advanced inline double wall belling function
2,Co-extrusion die with specical structure
3,PCC control system
| Delivery Time: | within 30-60 days after receipt of the down payment |
| Package: | wooden packaging,moistureproof packaging |
| Supply Ability: | 2 Set/Sets per Month |
| Minimum Order Quantity: | 1 Set/Sets |
| Payment Terms: | L/C,T/T |
| Port: | Qingdao Port |
| Double Wall Corrugated Pipe Line: | Double Wall Corrugated Pipe Line |
| Brand Name: | HanBang |
| Application: | Drain Pipe |
| Pipe Material: | PE |
| Type: | Other |
| Brand Name: | Highbank |
| Place of Origin: | Shandong China (Mainland) |