9) Delivery Time: Within 30 days each 20ft container after receiving the advance payment
8) Packing: In cartons then to a pallet or according to customer's request
7) Payment Term: 30% advance deposit, the balance T/T by copy of B/L
6) Size: 3/8" ~ 3 1/2"
5) Usage: Frame work and other construction
4) Point: Diamond
3) Shank: Barbed Shank
2) Finish: Electro Galvanized, Hot-Dip Galvanized, and other technique finish as your requirment
1) Material: High-quality low-carbon-steel Q195
Flat Head, Barbed Shank, Diamond Point, E.G. Finished
Delivery Time:Within 30 days per 20ft container after deposit
| Delivery Time: | Within 30 days each 20ft after receiving the deposit |
| Package: | In cartons then to a pallet or according to customer's request |
| Supply Ability: | 3500 Metric Ton per Month |
| Minimum Order Quantity: | 18 Metric Ton one 20ft container |
| Payment Terms: | T/T |
| Port: | FOBTianjin,China |
| Point: | Diamond |
| Head: | Flat |
| Shank: | Barbed |
| Length: | 3/8" ~ 3-1/2" |
| Material: | Steel |
| Type: | Roofing Nail |
| Brand Name: | GaoYun |
| Place of Origin: | Hebei China (Mainland) |