Frame Hardware the back of frame, lock on the back of frame. and hold the frame
Frame Hardware e back of frame, lock on the back of frame. and hold the frame
| Delivery Time: | 7-15 Days |
| Package: | Pvc Bag |
| Minimum Order Quantity: | 20000 Piece/Pieces |
| Payment Terms: | T/T,Cash |
| Port: | Ningbo |
| Material: | Iron |
| Brand Name: | SL Frame Hareware |
| Model Number: | H-013-014-015 |
| Place of Origin: | Zhejiang, China (Mainland) |