4. drop forged, high grade
3. surface finish: hot dipped galvanized, electro-galvanized, self-color
2. material: carbon steel, stainless steel
1. kind: rigging
Minimum Breaking Load=4*W.L.L.(Working Load Limited)
| Delivery Time: | Within 20 to 30 days for 1*20GP |
| Package: | Packing in bags/cartons then in steel pallets. |
| Supply Ability: | 100 Ton per Month |
| Minimum Order Quantity: | 1 Ton |
| Payment Terms: | L/C,T/T |
| Port: | Qingdao |
| Place of Origin: | Shandong China (Mainland) |