We also produce according to customer's design, detailed drawing and size is warmly welcome.
(7) Delivery time: Within 30 days each 20ft container after receiving the advance payment.
(6) Payment Term: 30% advance deposit, the balance T/T by copy of B/L.
(5) Loading Port: FOB Tianjin,China.
(4) Packing: In cartons then to a pallet or according to customer's request
(3) Usage: Square wood pole fixed.
(2) Finish: Electro Galvanized or Hot-Dip Galvanized
(1) Material: Iron Plate Q235
Metal Bracket finished in hot-dip galvanized.
| Delivery Time: | Within 30 days each 20ft after receiving the deposit |
| Package: | In cartons then to a pallet or according to customer's request. |
| Supply Ability: | 2000 Metric Ton per Month |
| Minimum Order Quantity: | 18 Metric Ton one 20ft container |
| Payment Terms: | T/T |
| Port: | FOBTianjin,China |
| Material: | Q235 |
| Finish: | Galvanized |
| Structure: | Single-side Bracket |
| Material: | Metal |
| Usage: | Shelf Bracket |
| Brand Name: | GaoYun |
| Place of Origin: | Hebei China (Mainland) |