We also produce according to customer's design, detailed drawing and size is warmly welcome.
(6) Delivery Time: Within 30 days each 20ft container after receiving the down payment
(5) Payment Term: 30% advance deposit, the balance T/T by copy of B/L.
(4) Loading Port: FOB Tianjin,China.
(3) Specification: 1600mm/1200mm in full length
(2) Finish: Electro Galvanized, and Hot-Dip Galvanized is also available.
(1) Material: Iron Q235
Screw-in Ground Drill, finished in electro galvanized
try ground drill to get through more products
| Delivery Time: | Within 30 days each 20ft after receiving the advance deposit. |
| Package: | On pallet or according to customer's request. |
| Supply Ability: | 1500 Metric Ton per Month |
| Minimum Order Quantity: | one 20ft container |
| Payment Terms: | T/T |
| Port: | Tianjin, China |
| Finish: | Galvanized |
| Length: | 1600mm/1200mm |
| Material: | Q235 |
| Length: | 1600mm/1200mm |
| Material: | Steel |
| Type: | Pole Anchor |
| Brand Name: | GaoYun |
| Place of Origin: | Hebei China (Mainland) |