We also produce according to customer's design, detailed drawing and size is warmly welcome.
6) Delivery Time: Within 30 days each 20ft container after receiving the advance deposit.
5) Payment Term: 30 percent advance deposit, the balance T/T against the copy of B/L
4) Packing: In cartons then to a pallet or according to customer's request
92mm
Bolt down pole anchor in Hot-Dip Galvanized finish
Used for erecting round poles
| Delivery Time: | Within 30 days each 20ft after receiving the advance deposit |
| Package: | In cartons then to a pallet or according to customer's request |
| Supply Ability: | 1500 Metric Ton per Month |
| Minimum Order Quantity: | one 20ft container |
| Payment Terms: | T/T |
| Port: | Tianjin,China |
| Material: | Q235 |
| Finish: | H.D.G. |
| Material: | Steel |
| Type: | Pole Anchor |
| Brand Name: | GaoYun |
| Place of Origin: | Hebei China (Mainland) |