contract: cn200885013 Cici xia
delivery time:10-15 days
port:ningbo or shanghai
price:usd 1-1.5
weight:190g
gas cylinder
zinc alloy material
handwheel brass or iron
gas cylinder
zinc alloy material
handwheel brass or iron
try gas cylinder to get through more products
| Delivery Time: | 10 days after recieved the advance payment |
| Package: | inner pp bagouter paper carton |
| Supply Ability: | 1000000 Piece/Pieces per Week |
| Minimum Order Quantity: | 5000 Piece/Pieces |
| Payment Terms: | L/C,D/P,T/T |
| Port: | ningbo or shanghai |
| Fob Price: | US$1-1.5ningbo or shanghai |
| Port Size: | 10mm |
| Media: | Gas |
| Temperature of Media: | Normal Temperature |
| Material: | Alloy |
| Power: | Hydraulic |
| Pressure: | Low Pressure |
| Structure: | Pressure Reducing |
| Standard or Nonstandard: | Standard |