Usually T1 time is 25 days.
Finish lead time:
3) We use materials recommended by our enginners which was accepted by our clients;
2) We source and use the appointed brand and item by our client;
1) We produce with the materials supplied by our clients;
Raw material:
5) One-stop service provided from designing, molding or tooling, injection and painting to assembly and delivery.
Injection Molding & Tooling:
1) OEM & ODM service available;
2) Raw Materials Optional;
3)Company Authorized;
4)Quality-guaranteed
Injection Molding & Tooling:
1) OEM & ODM service available;
2) Raw Materials Optional;
3)Company Authorized;
4)Quality-gu
| Delivery Time: | 30 days |
| Package: | Standard Packing of Export |
| Supply Ability: | 500000 Set/Sets per Year |
| Minimum Order Quantity: | 1 Set/Sets |
| Payment Terms: | L/C,T/T |
| Port: | Shanghai |
| specification: | as required |
| Product: | Household Product |
| Product Material: | Metal |
| Shaping Mode: | Plastic Injection Mould |
| Brand Name: | Huitong |
| Place of Origin: | China (Mainland) |