submersible motor cable

Following suspension of plunger engine coil wire for 24 hours in 15 C water, it is subjected to an initial 3 Kv 50 Hz voltage for 10 minutes. Following the high voltage trial,insulation resistance is tested through 100 V c.c.
The voltage test of engines wound with wire successfully passing the high voltage test will be determined through the following formula.
Plastic-Insulated Winding Wires :

Time-dependent behaviour of the specific insulation resistance under an alternating voltage load of 600 V in a water trough at a temperature of 80 C

Electrical Test

  • Place of Origin:Turkey
  • Country:Turkey
  • telephone:90-212-4521901
Place of Origin: Turkey

BRANDI TEKSTIL VE DIS TICARET LTD STI

Enter 20 to 3,000 English characters. Characters: 0 / 3000

Submitting We are sending your inquiry, please wait...