Product sourcing details

FOB Price
USD $3,000,000.00 / Piece
Place of Origin
China
Packaging
Standard

Supplier: Suzhou CMT Engineering Co., Ltd.

Purchasing information

Minimum order
1
Lead time
150 Days

Please confirm with the supplier: Model / reference, Key specifications / compatibility, Samples, Export markets, Supply capacity.

1. Product: Glass bottles. (for food, medicine, chemical industry...)

2. Capacity: Depends on your requirements. ( ≥20t/d, ...)

3. Main raw materials: Silica sand, feldspar, dolomite, soda ash, cullet...

4. Total plant area: 20, 000 sqm. 

5. Main parts:  Batch plant, Glass Furnace, Feeder, I.S. Machine, Annealing Lehr, Single Line/Palletizer, Shrink machine...

No.

Item.

Notes

I

Glass Furnace

 

II

Furnace Control System

 

III

Automatic Batching System

 

IV

Forming Machinery

 

 

1.Forehearth

2 PCS

 

2.Feeder

2 PCS

 

3.Double-Gob Servo Distributor

2 PCS

 

......

......

 

The seller's responsibility:

1.1 Design of the plant planning layout.

1.2 Design of melting furnace.

1.3 Design of control system of furnace.

1.4 Design of batching system.

1.5 Design of power supply system.

1.6 Design of water supply system.

1.7 Design of NG supply system.

1.8 Technology guidance at site.

1.9 Supply of all the machinery. (According to the list of contract)

1.10 Convenient and stable spare parts supply.

......

 

For more information, please contact us at any time.

  • Company: Suzhou CMT Engineering Co., Ltd.
  • Country: China (Mainland)
  • Business Type: Manufacturer
  • Market: Worldwide
  • Founded Year: 2000
  • Address: No.12 Huanghe Road, Changshu, Jiangsu, China
  • Contact: jeremy yao

Suzhou CMT Engineering Co., Ltd.

Enter between 20 to 3,000 characters. English only. Characters: 0 / 3000
submiting now We do inquire for you, please wait...