Transformer Load and No-load tester GDKF

Place Of Origin
China
Packaging
Wooden Case
Delivery
15 Days

1.1Function

Measure the transformer load current, load loss, short-circuit voltage, short circuit (load) losses.

1.2 Test Item

RMS phase voltage

Average value of three-phase AC voltage

Three-phase current RMS

Percentage of no-load loss and no-load current:

Load loss, impedance voltage, and the percentage of short-circuit impedance:

Any given temperature, load loss, the percentage impedance voltage and short circuit impedance;

Voltage waveform in the percentage of each harmonic component

Current waveform in the percentage of each harmonic component;

1.3 Technical parameters

Current measurement range: 100mA ~ 5A, accuracy class 0.2;

Voltage Range: 10V ~ 650V, accuracy class 0.2;

External transformer can broaden the scope of measurement instruments;

Frequency Range: 40 ~ 65Hz, accuracy class 0.2;

Power Input: AC220V ± 10%

  • Country: China (Mainland)
  • Business Type:
  • Market:
  • Founded Year:2009
  • Address:重庆市南岸区南坪金台大厦9-10
  • Contact:Daisy Tao
more images of Transformer Load and No-load tester GDKF
*Your name:
*Your Email:
*To:重庆格纳迪机电设备有限公司
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester INTRODUCTION: It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. PAMAMETERS: GDKC-2000 ...

GOLD

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

1.1 General introduction The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...

重庆格纳迪机电设备有限公司

GDKC-2000 Transformer On Load Tap Changer Tester
GDKC-2000 Transformer On Load Tap Changer Tester

GDKC-2000 Transformer On Load Tap Changer Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and three ...

ChongQing Gold Machine& Electric Equipment Co., Ltd.

GDKF Transformer Load Tester and No-load Tester
GDKF Transformer Load Tester and No-load Tester

GDKF Transformer Load Tester and No-load Tester I. Function Measure the transformer load current, load loss, short-circuit voltage, short circuit (load) losses. II.Test Item RMS phase voltage Average value of three-phase AC voltage Three-phase current RMS Percentage of no-load ...

ChongQing Gold Machine& Electric Equipment Co., Ltd.