GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
General introduction:
- The tester can record switch operation waveform in overall process.
- The longest time is 6.4s.
- It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.
- It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.
Technique index:
1. Three way independent test power, the maximum output current is 0.5A.
2. Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter, the 3.Maximum sampling rate can reach 400KHz
4. Tester set sampling rate:10~20KHz
5. Maximum save time of single waveform:6.4s
6.Transition resistance measuring scope:0~40Ω
7.Measuring precision:<10%
8.Power supply: 220V±10% power:200W
9. Size: 410mm´320mm´260mm
10. Weight: 20kg
What Else we have:
Electric Testing Equipment |
Item: | CT/PT Analyzer | Full-auto Transformer Ratio Tester |
| High Voltage Circuit Breaker Tester | Transformer DC Resistance Tester |
| Portable Wave recorder | Voltage Divider |
| Volt-ampere Ratio Tester | Dry/Wet/Oil-type Transformer | |
| Insulating Oil Tester | High-current Generator |
| Oil Dielectric Loss Tester | Lighting Rod Tester/Earth-Resistance Tester |
Why Choose Us:
- Always Customer First.
- Professional Testing Equipment Supplier,with 5 years experience in this field.
- Exllent after-sale service and Always Competitive Price.
- English operating interface.
- Wtih In-house quality control.All the Equipments will be tested before leaving factory.
- All the Equipment has one year warranty.