GDKC-2000 Transformer Load Voltage Adjustment Switch
Tester
General
introduction:
- The
tester can record switch operation waveform in overall process.
- The
longest time is 6.4s.
- It can
test various parameters such as transition waveform, transition time, transition
resistance and three phase synchronization one time and analyze results
automatically.
- It has
power-off protection, over-voltage protection, perpetual clock and high-speed
printing.
Technique
index:
1. Three
way independent test power, the maximum output current is 0.5A.
2.
Processing part: 80C320 high speed 8 digit microprocessor High speed A/D
converter, the 3.Maximum sampling rate can reach 400KHz
4.
Tester set sampling rate:10~20KHz
5.
Maximum save time of single waveform:6.4s
6.Transition
resistance measuring scope:0~40Ω
7.Measuring
precision:<10%
8.Power
supply: 220V±10% power:200W
9. Size:
410mm´320mm´260mm
10.
Weight: 20kg
What
Else we have:
| Electric Testing
Equipment |
| Item: |
CT/PT
Analyzer |
Full-auto Transformer
Ratio Tester |
| |
High
Voltage Circuit Breaker Tester |
Transformer DC
Resistance Tester |
| |
Portable Wave
recorder |
Voltage
Divider |
| |
Volt-ampere Ratio
Tester |
Dry/Wet/Oil-type
Transformer |
|
| |
Insulating Oil
Tester |
High-current
Generator |
| |
Oil
Dielectric Loss Tester |
Lighting Rod
Tester/Earth-Resistance Tester |
Why
Choose Us:
- Always
Customer First.
- Professional Testing Equipment Supplier,with 5 years
experience in this field.
- Exllent
after-sale service and Always Competitive Price.
- English operating
interface.
- Wtih In-house quality
control.All the Equipments will be tested before leaving factory.
- All the Equipment has
one year warranty.