JZ Series Deadline Anchor for Drilling Rig

FOB Price
USD $5,000.00 / Piece
Place Of Origin
China
Minimum Order
1
Packaging
1set per case
Delivery
35Days
JZ Series Deadline Anchor for Drilling Rig

It is JZ series weight indicator of an important part of, oil, geological exploration rig, workover drilling or workover process, measuring the drill hanging weight and WOB change, an instrument, to help driller master the operating parameters of the rig, workover rig drilling or workover and judgment drilling work status.JZGdead line anchor made of high-quality steel, after 150% overload capacity test. High precision, solid, stable and reliable. Supporting the use of heavy table and the sensor with JZ.

parameters:

Type Anchor Type Form of Primary Instrument Max.Deadline load(kN) Number of Lines Load(kN)
JZ900 JZG72 Horizontal 720 14
12
10080
8640
JZ700 JZG60 Vertical 600 14
12
8400
7200
JZ500 JZG42 Vertical 420 12
10
5040
4200
JZ500A JZG41 Horizontal 410 12
10
4920
4100
JZ400 JZG35 Vertical 350 12
10
8
4200
3500
2800
JZ400B JZG34A Horizontal 340 12
10
4080
3400
JZ250 JZG24 Vertical 240 12
10
8
2880
2400
1920
JZ200 JZG20 Horizontal 200 10
8
6
2000
1600
1200
JZ150A JZG18A Vertical 180 10
8
6
1800
1440
1080
JZ150 JZG18 Horizontal 180 10*
8
6
1800
1440
1080
JZ100 JZG15 Horizontal 150 10
8
6
1500
1200
900
JZ60 JZG10 Straight pull 100 8
6
4
800
600
400
JZ40 JZG10A Horizontal 100 6
4
600
400


  • Country: China (Mainland)
  • Business Type:
  • Market:
  • Founded Year:
  • Address:
  • Contact:Lucky Hou
more images of JZ Series Deadline Anchor for Drilling Rig
more images of JZ Series Deadline Anchor for Drilling Rig
*Your name:
*Your Email:
*To:Dongying Lake Petroleum Technology Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...

JZ500/JZ500A Weight Indicator for Drilling Rig Deadline Anchor JZG20
JZ500/JZ500A Weight Indicator for Drilling Rig Deadline Anchor JZG20

Description: Weight indicator suitable for drilling and geological exploration drilling rig or workover process instructions and record the drilling hanging weight and WOB change, it can help drillers to master the working parameters and judge the working state of drilling ...

Dongying Lake Petroleum Technology Co.,

High-quality API Standard Deadline Anchor as Rig Accessories for Well Drilling
High-quality API Standard Deadline Anchor as Rig Accessories for Well Drilling

1. Main Technical Parameters: 2. Product Description: Dead line anchor is used as a display instrument for indicating and recording the drilling string changes in weight and pressure, helping the driller to master the working parameter and judge the drilling state in drilling ...

Dongyng Lake Petroleum Technology Co.,Ltd

MDL-D series Anchor Caterpillar Drilling Rig
MDL-D series Anchor Caterpillar Drilling Rig

MDL-100D、MDL-120D、MDL-160D、MDL-200D Anchor Caterpillar Drilling Rig is a high efficiency drilling rig mainly for anchoring, jet grouting and dewatering, which is well designed and produced by Jiangsu Wuxi Mineral Exploration Machinery General Factory Co., Ltd. This series ...

江苏省无锡探矿机械总厂有限公司