Fujian Sanming Yikun Machinery Co.,Ltd is a professional manufacture of cast steel parts, cast iron parts, metallurgical equipment, mining equipment, water and hydropower equipment, chemical equipment and non-standard equipment etc.
The main hydropower turbine parts include (not limited to the following): Pelton turbine blades, cross-flow turbine blades, propeller blades, bulb turbine blades, tube turbine blades, Francis turbine blades Kaplan turbine blades.
Windmill mainly includes wind blades, turbine, wheel hub, and wind tower. Each component belongs to oversize cargo which needs to be transported by ordinary highway and also needs to be transported by specialized vehicles. For the wind blade, its length is very long, which has ...
Wind energy is one of the cleanest renewable energy in nature and has attracted more and more attention all over the world. China\'s new energy strategy development focuses on the vigorous development of wind power generation. Since 2008, domestic wind power construction has ...
Wind Turbine Transport Trailer Windmill mainly includes wind blades, turbine, wheel hub, and wind tower. Each component belongs to oversize cargo which needs to be transported by ordinary highway and also needs to be transported by specialized vehicles. For the wind blade, its ...
Windmill Blade Trailers for Sale Wind energy is one of the cleanest renewable energy in nature and has attracted more and more attention all over the world. China\'s new energy strategy development focuses on the vigorous development of wind power generation. Since 2008, ...
The Eco-Sources 300W 6-Blades Wind Turbine Generator is an equipment to convert wind energy into electric power which is changed into storage battery group. It can be widely used in rich wind areas but without normal energy supply from any power system. It is capable of ...
Typical Application Of Coating Wind turbine blade putty, primer, top coating Construction Method Air spray, airless spray, roller coating Use Note It can be natural dry or barking dry and used after 5-10 minutes of mixed. • must use the specific diluent dilution, the spray ...
CSEC Focus on supply of package solution design and E&M equipment turnkey basis for hydropower station.we combined the personnels and capability of Water conservancy and Hydropower Survey and Design Institute, supporting the customers from project site investigation, ...
Packaging & Delivery Packing Details :Exporting Wooden package or Steel Package Delivery Time :3-6 months Company Information CSEC Focus on supply of package solution design and E&M equipment turnkey basis for hydropower station.we combined the personnels and capability of ...
Hot-end nickel base alloy casting blades of turbochargers, gas turbines, engines and so on. Applying areas: aviation, marine, locomotive and other areas. Over 10 years experience of vaccum precision casting. ...
DFT DFS pcd inserts drill for wind turbine blade 1.Features: 1) high hardness 2) good wear resistance, 3) little coefficient of friction 4) good adhesiveness resistance. 2.Application: for processing wind turbine blades of wind powered electircity generation. 3.Workpiece ...