GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
INTRODUCTION:
It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.
PAMAMETERS:
GDKC-2000 Transformer Load Voltage Adjustment Switch TesterPARAMETER | GDKC-2000 |
---|---|
Auto./manual | Fully-automatic |
Fuction | Test transformer load voltage adjustment switch |
Test power | Three ways independent power |
Max. output current | 0.5A |
Processing part | 8 digit microprocessor high speed A/D onverter, the maximum sampling rate can reach 400KHz |
Test set sampling rate | 10~20KHz |
Maxmum save time of single waveform | 6.4s |
Transition resistance measuring scope | 0~40Ω |
Measuring precision | 1-5W Δ≤±10%, 5~40W Δ≤±5% |
Protection | Power off-off protection, over-voltage protection |
Tim display | Perpetual clock |
Date print | Yes |
Power supply | 220V±10% power: 200W |
Dimension | 410*320*260 mm |
1.1 General introduction The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...
GDKC-2000 Transformer On Load Tap Changer Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and three ...
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and ...