GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

FOB Price
USD $5.00 / Piece
Place Of Origin
China (Mainland)
Fuction
Test transformer load voltage adjustment switch
Max. Output Current
0.5A
Maxmum Save Time Of Single Waveform
6.4s
Protection
Power off-off protection, over-voltage protection
Minimum Order
1
Auto./Manual
Fully-automatic
Test Power
Three ways independent power
Test Set Sampling Rate
10~20KHz
Transition Resistance Measuring Scope
0~40Ω
Power Supply
220V±10% power: 200W
Packaging
1 set each wooden case
Delivery
7 Days

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

INTRODUCTION:

It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically.

PAMAMETERS:

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
PARAMETER GDKC-2000
Auto./manual Fully-automatic
Fuction Test transformer load voltage adjustment switch
Test power Three ways independent power
Max. output current 0.5A
Processing part 8 digit microprocessor high speed A/D onverter, the maximum sampling rate can reach 400KHz
Test set sampling rate 10~20KHz
Maxmum save time of single waveform 6.4s
Transition resistance measuring scope 0~40Ω
Measuring precision 1-5W Δ≤±10%, 5~40W Δ≤±5%
Protection Power off-off protection, over-voltage protection
Tim display Perpetual clock
Date print Yes
Power supply 220V±10% power: 200W
Dimension 410*320*260 mm
  • Country: China (Mainland)
  • Business Type: Manufacturer
  • Market:Africa
  • Founded Year:2009
  • Address:
  • Contact:Robbin Charles
more images of GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
more images of GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
*Your name:
*Your Email:
*To:GOLD
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester
GDKC-2000 Transformer Load Voltage Adjustment Switch Tester

1.1 General introduction The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results ...

重庆格纳迪机电设备有限公司

GDKC-2000 Transformer On Load Tap Changer Tester
GDKC-2000 Transformer On Load Tap Changer Tester

GDKC-2000 Transformer On Load Tap Changer Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and three ...

ChongQing Gold Machine& Electric Equipment Co., Ltd.

GDKC-2000 Power Transformer Tap Switch Tester
GDKC-2000 Power Transformer Tap Switch Tester

GDKC-2000 Transformer Load Voltage Adjustment Switch Tester General introduction: The tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and ...

ChongQing Gold Mechanical & Electrical Equipment Co., Ltd.