Guardrail pile driver

Minimum Order
1
Packaging
N/A
Delivery
15 Days

Product description of parapet pile driver

Guardrail pile driver is a kind of road guardrail steel pipe pile pressuring equipment, this machine adopts diesel power, full hydraulic mechanical transmission, has the characteristics of light driving, high piling precision, durability, energy conservation and environmental protection, especially suitable for the field construction of road guardrail installation, maintenance and emergency repair.

The guardrail hydraulic pile driver by the r&d engineers and field service technician according to different conditions in the environment of actual combat, and update through continuous research and development, research and development production of a kind of optimal new hydraulic piling equipment for energy conservation and environmental protection, at the completion of all kinds of complex formation of guardrail installation job, fully embodies the its high quality, high efficiency, high energy saving, high life, etc.Hydraulic guardrail pile driver has the advantages of accurate pile driving, fast moving, high accuracy, long service life, oil saving and environmental protection.It is a new kind of equipment for highway protection.

Instructions for use of guardrail pile driver

1. Check the mechanical system and hydraulic system, and the diesel engine tank water level and oil level are all normal before starting the diesel engine.After running at low speed without load for 3 ~ 5 minutes, work can begin.

2. The chassis of the machine is driven by a hydraulic motor, and the hydraulic speed is stepless.Adjust the diesel engine speed and fuel supply (manual valve control) to get different speed.Combined valve forward and back handle forward push for chassis forward pull for chassis back.The rest lower pressure arm lifting cylinder, upper frame horizontal cylinder, vertical column inclined cylinder, boom expansion cylinder, all have combined valve handle control, the handle forward push for the cylinder piston rod out, the back pull for the piston retract.

3. After arriving at the site, check that the vertical column is not vertical. If it is not vertical, you can adjust the vertical oil cylinder (or inclined pull rod) and the lateral screw rod.

4. Adjust the vertical position of the chassis and the horizontal position of the vertical column to make the vertical column reach the calibrated position.

5. Lift the hydraulic hammer to the top, put the lower part of the steel pipe pile on the pile position, and put the upper part on the pile head of the lower part of the hydraulic pressure hammer to press the steel pipe pile, and then open the hammer to drive the pile.The pile head keeps pressure on the steel pipe pile until the steel pipe pile is driven to the specified size.

6. Due to the shock and vibration caused by the poor operating conditions of the machine, the dynamic performance of each part should be observed at any time during operation.In case of abnormal noise or other abnormal phenomena, it should be stopped at any time for inspection, and can be used again after troubleshooting.If the joint of hydraulic system is found to be leakage or loose, it should be stopped for adjustment and fastening. After normal operation, it can be used again.

7. Before the end of each shift, the hydraulic hammer should be lowered to a low place, while the cylinder and piston rod should be reduced to the minimum.If the distance shifts, the column should be in an inverted state.

8. The actuator, auxiliary parts, accessories and electrical parts of the parapet pile driver shall be checked regularly for connection in the motor wiring part.

  • Country:
  • Business Type:
  • Market:
  • Founded Year:
  • Address:
  • Contact:Cathy Gong
*Your name:
*Your Email:
*To:zhongyun intelligent machinery
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters : 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

submiting now We do inquire for you , please wait ...

Track Shoes for Hitachi 50 Ton PD7 Pile Driver Undercarriage Parts
Track Shoes for Hitachi 50 Ton PD7 Pile Driver Undercarriage Parts

Product Description Product Name Hitachi PD7 Crawler Crane track shoe pads Type Crawler Crane Undercarriage Parts Brand Name EG Advantages Superior Material; OEM & High Quality; Prompt Shipment Place of Origin Shandong,China (mainland) Heat Treatment Whole hardening and ...

Yantai Evergrowing Import and Export Co.,Ltd

Track Shoes for Hitachi 50 Ton PD7 Pile Driver Undercarriage Parts
Track Shoes for Hitachi 50 Ton PD7 Pile Driver Undercarriage Parts

Product Description Product Name Hitachi PD7 Crawler Crane track shoe pads Type Crawler Crane Undercarriage Parts Brand Name EG Advantages Superior Material; OEM & High Quality; Prompt Shipment Place of Origin Shandong,China (mainland) Heat Treatment Whole hardening and ...

Yantai Evergrowing Import and Export Co.,Ltd

Telephone pole pile driver
Telephone pole pile driver

Product features of telephone pole pile driver The type 50 or type 65 tractor ACTS as the live power, the power is abundant, the off-road ability is strong suits with the field excavates the pit work.The utility pole drilling machine adopts the form of full hydraulic drive. ...

zhongyun intelligent machinery

Caterpillar pile driver
Caterpillar pile driver

Introduction of caterpillar pile driver Crawler pile driver adopts crawler running system (the crawler running system is composed of motor, planetary reducer and four-wheel drive wheel, supporting sprocket, supporting wheel, tensioning wheel and combined crawler board, which is ...

zhongyun intelligent machinery

Road pile-drivers
Road pile-drivers

Introduction of road pile driver Highway pile driver is a new type, high efficiency, self - propelled advanced highway equipment and pile - adding equipment.The pile driving depth is 1600mm, about 250-300 piles per day, and the walking speed is 3-5km /h. The pile driving ...

zhongyun intelligent machinery

Yugong Quality Proven small pile driver with Drilling depth from 3m to 18m
Yugong Quality Proven small pile driver with Drilling depth from 3m to 18m

Solar Pile Driving Rig of Crawler/Wheel Frame Complete products range: Crawler & Wheel types of pile driving Rig are popular High efficiency for pile drilling in the application of solar power station, buildings, expressway guardrails Diesel and hydraulic types are both ...

Henan Yugong Machinery Co., Ltd

high quality Screw pile driver with best selling and lower
high quality Screw pile driver with best selling and lower

Parameter Product name 360 degree spiral pile driver Model 32型 4100型 Max torque 2235Nm Grade ability 35° Adjustable drill pipe type Screw drill pipe Power head power 22kw Power head speed 50r/min Walking speed 40km/h Vehicle weight 6t type Diesel hammer pile driver ...

Henan Yugong Machinery Co,Ltd.

ZYC40B-B Multifunctional Hydraulic Static Pile Driver
ZYC40B-B Multifunctional Hydraulic Static Pile Driver

ZYC40B-B Multifunctional Hydraulic Static Pile Driver Product Feature: • Main product: ZYC series multi-functional Hydraulic Static Pile Driver Self-developed with 5 up-to-date patents. • The working principle is using hydraulic pressure to clamp precasted pile, H shape or ...

Hunan New Timehope Construction Machinery Co. Ltd.

Pile driver

Feature:Track Crane Place of Origin:Japan HITACHI PD9 - Pile Driver/Crawler Crane 55Tons Class Crawler Crane ...

ASIA CRANES ENTERPRISE