Searching tube , total 62105 products,queries done in 21 ms
cylinder tube

Delivery Time 45days Supply Ability 20000 Ton per Year Minimum Order Quantity 200 Ton Payment Terms L/C,T/T Port shanghai Grade ST52 Brand Name TENT Technique Seamless Place of Origin Jiangsu China (Mainland) Standard DIN Grade ST52 Brand Name TENT Technique Seamless Place of Ori

Changzhou Tent Hydraulic Machinery Co., Ltd.   

Industrial seamless stainless steel tube

Package nylon packing /wooden case Supply Ability 200 Ton per Month Minimum Order Quantity 1 Ton Payment Terms L/C,T/T Port NINGBO Fob Price US$3000-4800NINGBO Length 6000 Grade 304 Specification 1/8''--26'' Model Number BS-P&T-016 Brand Name Bosheng Pipe Technique Seamless Lengt

Wenzhou Bosheng Steel Pipe Manufacturing Co., Ltd.   

Rectangle Steel Tube

Surface Treatment Galvanized Section Shape Square Grade Q195 Standard GB Surface Treatment Galvanized Section Shape Square Grade Q195 Standard GB Easepal is specialized in manufacturing the steel products, welded steel tube(In shape square, rectangular,round),H beam,etc BS, UNI,

Xiamen Openex Mechanical Technology Co., Limited   

Galvanized Pipe(hot dip galvanized pipe,galvanized steel tube)

Package export standard packing or as customer's indication. Payment Terms L/C,T/T Surface Treatment Galvanized Secondary Or Not Is Secondary Place of Origin China (Mainland) Grade Q195 Standard GB Surface Treatment Galvanized Secondary Or Not Is Secondary Place of Origin China (

Shanghai Baoshu Steel Co., Ltd.   

DIN Medium pressure pipe

Delivery Time according to client's requirement Supply Ability 3600 Ton per Year Minimum Order Quantity 1 Ton Payment Terms L/C,T/T Port Xin'gang Fob Price US$1500-10000Xin'gang Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Oil Pipe Place of Origin Hebei China

Yanshan County Zhengda Pipe Fitting Manufacturing Co., Ltd.   

API pipe, pipe, API 5L X52 PSL2 Pipes, seamless pipe

Delivery Time 7days Package according to customer' requirements Supply Ability 2000 Ton per Month Minimum Order Quantity 5 Metric Ton Payment Terms L/C,D/A,D/P,T/T,Western Union,MoneyGram Port Main port in the world Fob Price US$800-1200Main port in the world Secondary Or Not Non

Everbright Int'l Holdings (HK) Ltd.   

high pressure boiler tube

Delivery Time 3~7day Supply Ability 60 Metric Ton per Day Minimum Order Quantity 0 Kilogram Model Number caliber50~630cm,wall thickness2~30cm Brand Name Shanghai Shunyi Technique Seamless Place of Origin China (Mainland) Model Number caliber50~630cm,wall thickness2~3... Brand Nam

Shanghai Shunyi Mechanical and Electrical Equipment Co., Ltd.   

Galvanized Steel pipe

Delivery Time WITHIN 30 DAYS AFTER THE CONTRACT SIGNED Package Standard Exporting Package packed in bundles Special package is also avaliable depends on customer's request. Supply Ability 10000 Metric Ton per Month 0 Minimum Order Quantity 25 Metric Ton 0 Payment Terms L/C,T/T Po

Tianjin Hengji Steel Co., Ltd.   

Carbon steel tube

Delivery Time Less than 30 days Package Standard packing in bundle/bulk or as customer's requirement. Supply Ability 100000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms T/T Port tianjin xingang Fob Price US$660-760tianjin xingang Secondary Or Not Is Secondary Alloy Or

Tianjin Guoying Industry & Trade Co., Ltd.   

Welded steel tube

Supply Ability 10000 Ton per Month 10,000MT/month Minimum Order Quantity 100 Ton 100MT Payment Terms L/C Brand Name QiYuan Welding Line Type ERW Technique ERW Secondary Or Not Is Secondary Place of Origin Jiangsu China (Mainland) Grade Q195 Brand Name QiYuan Welding Line Type ERW

Zhangjiagang Zhongyuan Pipe-Making Co., Ltd.   

sonic tube

Delivery Time 40 days Package wooden case Supply Ability 100000 Kilometer per Month Minimum Order Quantity 1000 Kilometer Payment Terms T/T Port Tianjin Fob Price US$1000-20000Tianjin Special Pipe Thick Wall Pipe Section Shape Square Secondary Or Not Is Secondary Alloy Or Not Non

Cangzhou Sanqing Industry and Trade Co., Ltd.   

ERW steel pipe

Delivery Time 30days Package Export packing Supply Ability 20000 Metric Ton per Month Minimum Order Quantity 25 Metric Ton Payment Terms L/C,T/T Technique ERW Surface Treatment Galvanized Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid

Cangzhou Xiangyu Metal Material Co., Ltd.   

carbon steel pipe

Delivery Time within 15 days or as client's requestments. Package 1. Bundle packing.2. Bevelled end or plain end or warnished as per buyer's requestments.3. Marking as per customer's requests.4. Painting varnish coating on the pipe.5. Plastic caps at ends. Supply Ability 200 Ton

Liaocheng Xinhaifeng Steel Pipe Manufacturing Co., Ltd. (Development Zone)   

welded pipe

Package by wooden cases or by bundles,two ends with plastice cap. Payment Terms L/C,T/T Technique Welded Brand Name stellar Place of Origin Zhejiang China (Mainland) Standard GB Technique Welded Brand Name stellar Place of Origin Zhejiang China (Mainland) Standard GB stainless st

Stellar Tube & Pipe Group Co., Ltd.   

Stainless Sanitary Mirror Tube

Supply Ability 500 Ton per Month Technique Seamless Technique Cold Drawn Place of Origin China Standard ANSI Technique Seamless Technique Cold Drawn Place of Origin China Standard ANSI Features 1) Commodity seamless and welded austenitic stainless steel pipes 2) Process method Fe

Shanghai Shengyang Fluid Equipment Co., Ltd.   

EMT Conduit, EMT pipe, EMT tube

Delivery Time 35days Package in bundles Supply Ability 300000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Surface Treatment Galvanized Certification UL Special Pipe EMT Pipe Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Place of Or

Shanghai Sonitic Steel Trading Co., Ltd.   

seamless steel pipe

Package The sizes up to 200mm(OD) will be bundled; the sizes over 200mm will be in nude. Supply Ability 9000 Piece/Pieces per Month Minimum Order Quantity 1 Piece/Pieces Payment Terms L/C,D/P,T/T Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Is Alloy Application

Jinan Kinger Pipeline Corp.   

Galvanized Steel Pipe

Delivery Time 10 to 20 days Package Standard seaworthy export packing, other types of packing can be customized according to every client's requirements. Supply Ability 50,000,000 Ton per Year 0 Minimum Order Quantity 100 Ton 0 Payment Terms T/T Port Xingang port,Tianjin Fob Pric

Tianjin Liwei Iron & Steel Co., Ltd.   

zirconium tube

Delivery Time 100days Package Export packing Supply Ability 10 Ton per Quarter Payment Terms L/C,Bank transfer Secondary Or Not Is Secondary Place of Origin Shanxi China (Mainland) Secondary Or Not Is Secondary Place of Origin Shanxi China (Mainland) Zirconium tube, we have zirco

Hengxin Rare Material Limited Liability Company   

EMT tube 1/2"

Delivery Time 15 to 35 days,according to per PO. Package Bundle,tied with wires,coved with woven bag. Supply Ability 800 Ton per Month Minimum Order Quantity 20 Ton 5 Ton per Size Payment Terms L/C,T/T Port Shanghai Fob Price US$1.05-2.00Shanghai Secondary Or Not Non-secondary Al

Zhangjiagang Yihuatong Metal Material Co., Ltd.