tube - Manufacturers, Suppliers & Exporters

Total 51591 products found
ASTM A106 Gr.B seamless steel pipe

Delivery Time about 30-45 days after receipt of the T/T downpayment Package Usually, tied in bundles by steel strips for long distance transportationaccording to various requirements of our customers Supply Ability 200,000 Ton per Year about 500 tons per day Minimum Order Quantit

Shandong Runhe Tube Industry Co., Ltd.   

Large OD mine, water and line Pipe and Tube with Thick Wall

Delivery Time 30 days Package pc by pc Payment Terms L/C,T/T,L/C at sight Brand Name SH Model Number SH-LDP Special Pipe Thick Wall Pipe Section Shape Round Secondary Or Not Non-secondary Place of Origin Shanghai China (Mainland) Standard BS, GB, ASME Brand Name SH Model Number S

Shanghai Shenhua Steel Tube Co., Ltd.   

Seamless Tube EN 10224

Delivery Time 45 days Package In bundle,wooden cases,non woven cloth or bags,or as required. Supply Ability 1,380.00 Metric Ton per Year Minimum Order Quantity 10 Metric Ton Payment Terms L/C,T/T Port Tianjin Fob Price US$680.00-1,380.00Tianjin Type Seamless Secondary Or Not Non-

Beijing Topensea International Trade Co., Ltd.   

steel pipe

Delivery Time 20 days after we receive deposite Package packing into bundles with steel strips Supply Ability 3000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Ji

Nantong Sanzhong Pipe Co., Ltd.   

galvanized steel tube

Delivery Time 45DAYS AFTER WE RECEIVE YOUR DOWN PAYMENT OR ORIGINAL L/C Package Bundless, seaworthy wooden casea, with or with out edge rotector, steel hoop and seals, or as per customer's requirments Supply Ability 2100 Ton per Month Minimum Order Quantity 20 Ton one container P

Tianjin Huaxia Tengfei Iron & Steel Trade Co., Ltd.   

Galvanized steel tube

Delivery Time 3-30 days Package In bundles,wrapped with steel strips, caps or PVC. Supply Ability 17000 Metric Ton per Month we have more than 10 production line Minimum Order Quantity 20 Metric Ton This is our minimum quantity. Payment Terms L/C,T/T,MoneyGram Port Tianjin Fob Pr

Tianjin Tuofeng Industry & Trade Co., Ltd.   

galvanized square pipe

Delivery Time 30-45DAYS Supply Ability 3000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port XINGANG,CHINA Fob Price US$600-1000XINGANG,CHINA Technique ERW Surface Treatment Galvanized Section Shape Rectangular Alloy Or Not Non-alloy Application Structure Pi

Tangshan Zhuofan Trading Co.,Ltd.   

seamless pipe

Delivery Time as Items negotiated. Package as buyer's erquest Supply Ability 2000 Ton per Month Minimum Order Quantity 6 Ton Payment Terms L/C,T/T,Western Union,paypal Technique Seamless Alloy Or Not Is Alloy Application Chemical Fertilizer Pipe Place of Origin Henan China (Mainl

Puyang Zhongshi Group Co., Ltd.   

Precision Steel Tube

Delivery Time 30 days Package standard packing. Supply Ability 3000T/month Minimum Order Quantity 20T Payment Terms L/C,T/T Technique Seamless Dimensions 0~168.3mm Grade ST 37,ST42,ST52 and so on Type Seamless Application Gas Pipe Place of Origin Jiangsu China (Mainland) Grade ST

Changzhou Mingyu Steel Tube Co., Ltd.   

special thin tube

Delivery Time about one month Package according to buyer request Supply Ability 50,000,000 Kilogram per Year Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port shanghai Fob Price US$800-3000shanghai Section Shape Rectangular Secondary Or Not Non-secondary Application Structu

Wuxi City Fuyang Precision Pipe Making Co., Ltd.   

WELDED TUBE

Package IN BUNDLE Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin Tianjin China (Mainland) Outer Diameter DN15-DN114 Grade A179B, A53B, Q195, Q215, Q235, Q345, 20G

Tianjin Shun Taida Imp & Exp Co., Ltd.   

High Pressure Oil Tubes for Diesel Engine

Delivery Time 30-60 days Package internal wrapped with plastic foil,external wrapped withP E.packed in seaworthy wooden cases Supply Ability 100 Ton per Month Minimum Order Quantity 2 Ton Payment Terms L/C,T/T Port Shanghai Fob Price EUR1000-3000Shanghai Usage oil tubes for diese

Zhangjiagang Huadian Import & Export Co., Ltd.   

ERW steel tube

Delivery Time 30 days Package exporting standard package Supply Ability 400000 Ton per Year Minimum Order Quantity 25 Ton Payment Terms T/T Port Tianjin Fob Price US$600-800Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Gas Pipe Place of Origin Tianjin

Tianjin Hengji Steel Co., Ltd.   

ASTMA106 seamless steel tube

Delivery Time 30days Package in bundle Supply Ability 150000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T,Western Union Port tianjin Standard DIN Technique Seamless Place of Origin Hebei China (Mainland) Standard DIN Technique Seamless Place of Origin Hebei Ch

Hebei Jiayuan Tiancheng Seamless Steel Tubing Co., Ltd.   

oval steel tube / carbon steel pipe

Payment Terms L/C,T/T welded pipe black Section Shape Other Secondary Or Not Non-secondary Place of Origin China (Mainland) Standard GB welded pipe black Section Shape Other Secondary Or Not Non-secondary Place of Origin China (Mainland) Standard GB welded pipe,black tube, 30x60

Tianjin High Metal International Co., Ltd.   

Hot dipped galvanized steel pipe(hot deep galvanized steel tube, galvanized steel pipe)

Delivery Time Around 15days Package As per customer's requirement Supply Ability 2000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port Shanghai Or Tianjin Port Fob Price US$588-850Shanghai Or Tianjin Port Technique Cold Rolled Surface Treatment Galvanized Se

Shanghai Baoshu Steel Co., Ltd.   

Welded Tube

Delivery Time within 15-20 days after deposite or negotiation Package 1.small size pipes can be packed by steel strips into bundles.2.large size pipes can be packed in bulk.3.woven cloth4.according to the requirement of customers. Minimum Order Quantity 10 Ton Payment Terms L/C,T

Tianjin Jie Feng Steel Pipe Industry and Trading Co., Ltd.   

JIS G3454,STPG370,STPG410,Boiler tubes,Ms.TuTu

Delivery Time 30-60days Package Package bare packing/bundle packing/crate packing/wooden protection at the both sides of tubes Supply Ability 4500 Metric Ton per Month Minimum Order Quantity 5 Metric Ton Payment Terms L/C,T/T Port Shanghai Type Seamless Technique Cold Drawn Surfa

Suzhou Seamless Steel Tube Works   

EMT pipe 3/4"

Delivery Time 15 to 35 days,according to per PO. Package Small package,20pcs/bundle,tied with wires Master package,20pcs/small bundle,tied with wires,then 50small bundles/master,tied with steel straps Each bundle covered with woven bag. Supply Ability 800 Ton per Month 5 Ton per

Zhangjiagang Yihuatong Metal Material Co., Ltd.   

steel pipe

Delivery Time 20 days after conformed Package pipe cap, steel strips bundled Supply Ability 80000 Ton per Year Minimum Order Quantity 1 Ton Payment Terms L/C,T/T,Western Union Port XINGANG Model Number RL001 Brand Name RUILONG Type Seamless Secondary Or Not Non-secondary Alloy Or

JIAXING RUILONG PIPE CO.,LTD