Searching surface treatment , total 14812 products,queries done in 15 ms
Hot dipped galvanized steel pipe(hot deep galvanized steel tube, galvanized steel pipe)

Delivery Time Around 15days Package As per customer's requirement Supply Ability 2000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port Shanghai Or Tianjin Port Fob Price US$588-850Shanghai Or Tianjin Port Technique Cold Rolled Surface Treatment Galvanized Se

Shanghai Baoshu Steel Co., Ltd.   

Welded Tube

Delivery Time within 15-20 days after deposite or negotiation Package 1.small size pipes can be packed by steel strips into bundles.2.large size pipes can be packed in bulk.3.woven cloth4.according to the requirement of customers. Minimum Order Quantity 10 Ton Payment Terms L/C,T

Tianjin Jie Feng Steel Pipe Industry and Trading Co., Ltd.   

JIS G3454,STPG370,STPG410,Boiler tubes,Ms.TuTu

Delivery Time 30-60days Package Package bare packing/bundle packing/crate packing/wooden protection at the both sides of tubes Supply Ability 4500 Metric Ton per Month Minimum Order Quantity 5 Metric Ton Payment Terms L/C,T/T Port Shanghai Type Seamless Technique Cold Drawn Surfa

Suzhou Seamless Steel Tube Works   

casing pipe

Delivery Time in 2weeks Package according to the customer's requirement Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Special Pipe API Pipe Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Oil Pipe Place of Origin China (Mainland) Grade

Tianjin Shitong Iron and Steel Co., Ltd.   

EMT pipe 3/4"

Delivery Time 15 to 35 days,according to per PO. Package Small package,20pcs/bundle,tied with wires Master package,20pcs/small bundle,tied with wires,then 50small bundles/master,tied with steel straps Each bundle covered with woven bag. Supply Ability 800 Ton per Month 5 Ton per

Zhangjiagang Yihuatong Metal Material Co., Ltd.   

steel pipe

Delivery Time 20 days after conformed Package pipe cap, steel strips bundled Supply Ability 80000 Ton per Year Minimum Order Quantity 1 Ton Payment Terms L/C,T/T,Western Union Port XINGANG Model Number RL001 Brand Name RUILONG Type Seamless Secondary Or Not Non-secondary Alloy Or

JIAXING RUILONG PIPE CO.,LTD   

High Quality Welded Steel Pipe With Reasonable Price

Delivery Time 15--20days Package strip bundle, bulk,.as per customer's requirements Supply Ability 500 Metric Ton per Day Minimum Order Quantity 25 Metric Ton Payment Terms L/C,T/T,Western Union Port tianjin Fob Price US$400-800tianjin Secondary Or Not Non-secondary Alloy Or Not

Hebei Xiang He Steel Pipe Co., Ltd.   

galvanized pipe

Delivery Time 30day Package in bundle Supply Ability 10000 Ton per Month Minimum Order Quantity 20 Metric Ton Payment Terms L/C,T/T Port TianJin Fob Price US$500-800TianJin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin China Thicknes

Wenzhou Design Trade Co., Ltd.   

Steel Pipe

Delivery Time Less than a month Package In bulkPicked by steel stripsAccording to the requirement of customers Supply Ability 500 Metric Ton per Week 1x20' Container Minimum Order Quantity 20 Metric Ton 1x20' Container Payment Terms L/C,T/T Port Xingang Port,China Fob Price US$60

Tianjin Hongaoda Metal Material Co., Ltd.   

Rectangular/square welded pipe and tube

Delivery Time 20days after we receive the deposite Package In bundles by steel strip Supply Ability 5000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,D/A,D/P,T/T Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Jian

Hai'an Marsden Metal Products Co., Ltd.   

Square steel pipe (black and annealed)

Delivery Time 15~30 days after receive your deposits. Package Our products can be packaged in bulk, bundles, or pvc; we also can package as customers requirements. Supply Ability 5000 Ton per Month According to our production capacity and stocks. Minimum Order Quantity 5 Metric T

Efya International Imp. & Exp. Co., Ltd.   

hot rolled or cold drawn alloy steel pipe

Delivery Time 30days Package Standard export packing In bundles, painting, caps, beveled edges or as per customer's request Supply Ability 80000 Ton per Year expanding Minimum Order Quantity 20 Ton one container Payment Terms L/C,T/T Port Shanghai Fob Price US$700-1500Shanghai S

Jiangsu Lixin Steel Pipe Group Co., Ltd.   

EP tube

Delivery Time 15 Package inner capped and baggedout crate Supply Ability 10000 Meter per Month Minimum Order Quantity 500 Meter Payment Terms L/C,T/T Port shanghai Fob Price US$0-30shanghai Type Seamless Technique Cold Rolled Certification ISO Application Gas Pipe Place of Origin

Jiang Su Chuang Yue Metal Industry Co., Ltd.   

High frequency longitudinal welded steel pipes

Delivery Time promptly Package packed in bundles, wrapped with steel strips / use bulk vessel or container or as per customer's requirement. Supply Ability 100,000 Ton per Year Minimum Order Quantity 30 Ton Payment Terms L/C,T/T Port tianjin port Fob Price US$400-800tianjin port

Tianjin Shengdahaichao Steel Pipe Co., Ltd.   

Oil casing pipe

Package wooden case Minimum Order Quantity 1 Ton Payment Terms L/C,T/T Port Shanghai Technique Seamless Surface Treatment Other Certification API Special Pipe API Pipe Section Shape Round Secondary Or Not Non-secondary Place of Origin China (Mainland) Grade API J55 Technique Seam

China Meheco International Trade Development Corporation   

EMT pipe(UL797/UL6)

Delivery Time 60days Package bundles Supply Ability 300000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port mainland Fob Price US$500-1000mainland Special Pipe EMT Pipe Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Place of Origin

Shanghai Sonitic Steel Trading Co., Ltd.   

seamless steel pipe gb/t8162

Delivery Time About ten days Package According to the requirement of the customers. Supply Ability 200 Ton per Day Minimum Order Quantity 10 Ton According to customers' requirement Payment Terms L/C,T/T Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure P

Dongying Jingcheng Seamless Steel Pipe Co., Ltd.   

API 5L spiral welded steel pipe

Delivery Time 7--14 days or rush your order Package IN BULK Supply Ability 500000 Ton per Year Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port TIANJIN Fob Price US$614.93TIANJIN Section Shape Round Secondary Or Not Is Secondary Alloy Or Not Non-alloy Application Oil Pipe

Beijing Reap International Trading Co., Ltd.   

galvanized pipe

Package standard exporting packing Surface Treatment Galvanized Grade ST52 Standard GB Surface Treatment Galvanized Grade ST52 Standard GB Galvanized steel pipes The product is formed with high quality welded tube and advanced galvanization technology and equipment. Product Descr

Hangzhou Amethyst Trade Co., Ltd.   

steel Pipe

Delivery Time 30days Package bundles Supply Ability 10000 Metric Ton per Month Minimum Order Quantity 30 Metric Ton Payment Terms L/C,T/T Surface Treatment Galvanized Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin

Guangzhou Pearl River Galvanizing Steel Pipe Works