Searching stainless steel , total 89652 products,queries done in 50 ms

spiral steel tube

Delivery Time about one month Package in bundle or according to our client's requirement Supply Ability 10000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms T/T Port tianjin Fob Price RMB5000-6000tianjin Welded Line Type Spiral Technique Welded Welded Line Type Spiral

Cangzhou Zhongrun Steel Tube Co., Ltd.   

Seamless Pipes

Delivery Time 30 days Minimum Order Quantity 1MT Payment Terms T/T, L/C Standard ASTM Model No 002 Technique Seamless Technique Cold Drawn Place of Origin China Standard ASTM Model No 002 Technique Seamless Technique Cold Drawn Place of Origin China Stainless steel seamless, weld

Zhejiang Conform Stainless Steel Tube Co., Ltd.   

ASTM A179 seamless steel pipe

Delivery Time within 15 days,if the order is less than 1500 tons Package ACCORDING TO CUSTOMER ORDER painting anti rust caps beveled edges Pe layers Supply Ability 400 Ton per Day can adjust the pland to meet the demand Minimum Order Quantity 10 Ton negotiation,can accept 5 tons

Tianjin Huanyu Hengtong Stainless Steel Co., Ltd. (Foreign Trade Dept.)   

cold rolled steel tube

Delivery Time 15-30 DAYS Package standard Supply Ability 300 Metric Ton per Month Minimum Order Quantity 1 Metric Ton Payment Terms L/C,T/T,Western Union Certification Other Brand Name WJ Standard ASTM Place of Origin Guangdong, China (Mainland) Certification Other Brand Name WJ

Guangzhou City Shanyou Trading Co., Ltd.   

Steel Pipe(Pipe,Precision Steel Pipe)

Delivery Time 45 days Package by bundle, plastic cap, or seaworthy wooden case, or as required Supply Ability 15000 Metric Ton per Month Minimum Order Quantity 1 Metric Ton Payment Terms T/T Port wenzhou/ningbo Technique Seamless stainless pipe steel tube Brand Name yonhall steel

ASTM stainless steel seamless pipe ( A312/A269/A213)

Delivery Time 25-40 days Package pipe with plugs both ends, non-woven fabric outside in seaworthy bundles; wooden case Supply Ability 6000 Ton per Year Minimum Order Quantity 0.5 Ton Payment Terms L/C,T/T Port Ningbo Fob Price US$2950-4950Ningbo Secondary Or Not Non-secondary All

Zhejiang Kanglong Steel Co., Ltd.   

stainless steel pipe

Delivery Time according to customer's requirement Package wooden boxes/end caps/plastic strips/plastic package for each pipe. Supply Ability 288 Ton per Week according to customer's requirement Minimum Order Quantity 20 Ton according to customer's requirement Payment Terms L/C,T/

Wuxi Dongzhi Stainless Steel Co., Ltd.   

seamless steel pipe

Delivery Time as the customer's need Package as the customer's need Supply Ability 500 Ton per Month Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port Tianjin Port Fob Price US$500-30000Tianjin Port Secondary Or Not Non-secondary Alloy Or Not Is Alloy Application Hydraulic

Hebei Hongrun Heavy Industry Group Co., Ltd.   

stainless steel hexagonal pipe

Delivery Time 25 days Package Export seaworthy packing with each bundles tied and protected,or according buyers' requirement. Supply Ability 50 Ton per Month Minimum Order Quantity 2 Ton Payment Terms L/C,T/T Port Shanghai Type Seamless Brand Name Chaowei Technique Cold Drawn All

Taizhou Chaowei Electromechanical Equipment Manufacturing Co., Ltd.   

pipe

Delivery Time according to customer's requirement Package wooden cases & pallets Supply Ability 50000000 Ton per Year Minimum Order Quantity 1 Piece/Pieces Payment Terms L/C,T/T Port Tianjin Fob Price US$0.1-100000Tianjin Certification BSI Special Pipe API Pipe Section Shape Rect

Hebei Tongde Pipe Fitting Manufacturing Co., Ltd.   

seamless steel pipe

Delivery Time 45DAYS Package standard export package and caps Supply Ability 1000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port Tianjin XINGANG Fob Price US$500-800Tianjin XINGANG Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure

Hebei Baohang Machinery And Electrical Equipment Co., Ltd.   

steel pipe

Delivery Time 20 DAYS Package NORMAL PACKING Supply Ability 300 Metric Ton per Month Minimum Order Quantity 1.00 Metric Ton Payment Terms L/C,T/T,Western Union Port TIANJIN,CHINA Brand Name Kangda Technique Welded Alloy Or Not Is Alloy Place of Origin Cangzhou Standard DIN Brand

Kangda Machine-Made Pipe Fittings Co., Ltd.   

LPG/CNG Pipe(hose,tube)

Secondary Or Not Is Secondary Secondary Or Not Is Secondary Sell LPG/CNG High Pressure Pipe (pipe,seamless steel pipe,stainless steel pipe), 6mm and 8 mm for LPG or CNG (pipe,seamless steel pipe,stainless steel pipe)

Wenzhou Pneumatic Elements Factory   

spiral pipe tube

Welded Line Type Spiral Welded Line Type Spiral Technique Welded Surface Treatment Galvanized Secondary Or Not Is Secondary Welded Line Type Spiral Welded Line Type Spiral Technique Welded Surface Treatment Galvanized Secondary Or Not Is Secondary Spiral pipe/Spiral Tube/air duct

Yuyao Dongfang Ventilation Engineering Co., Ltd.   

Tube

Surface Treatment Galvanized Certification DNV\BV\GL\LR\ABS Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Hydraulic Pipe Place of Origin Shanghai China (Mainland) Standard DIN Type Seamless Grade ST37, ST52 Technique Seamless Technique Cold

Flupac Piping Systems (Shanghai) Co., Ltd.   

thick-wall steel pipe,china seamless steel pipe,seamless steel pipe manufacturer

Delivery Time 35 DAYS Package BUNDLES AND WOODEN BOX Supply Ability 15000 Ton per Year Minimum Order Quantity 1 Ton Payment Terms L/C,D/P,T/T,CAD Port NINGBO OR SHANGHAI Certification ISO Steel Grade 300 Series Type Seamless Brand Name PYE Grade 300 Series Dimensions OD 6mm-830mm

Zhejiang Pengye Stainless Steel Tube Industrial Co., Ltd.   

Industrial Hose, Braid Hose

Delivery Time 30 days Supply Ability 10,000pcs/month Minimum Order Quantity 100pcs Payment Terms L/C, T/T Port NINGBO Fob Price US$43-50NINGBO Model Number HW-2 Technique Welded Certification ISO9001 Brand Name Hongwu Place of Origin China Standard ANSI Model Number HW-2 Techniqu

Ningbo Hongwu Pipe Industry Co., Ltd.   

stainless seamless pipe/tube

Delivery Time 20days aftere we receive the deposite Package In bundles by steel strip Supply Ability 5000 Ton per Month Minimum Order Quantity 7 Ton Payment Terms L/C,D/A,D/P,T/T Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Jian

Hai'an Marsden Metal Products Co., Ltd.   

steel tube

Delivery Time 15--30 days when we have signed contract Package Bare package Supply Ability 550 Metric Ton per Week Minimum Order Quantity 25 Metric Ton Payment Terms L/C Port tianjin Fob Price US$755-1650tianjin Section Shape Square Secondary Or Not Non-secondary Alloy Or Not Is

Tianjin Shi Ji Chang Sheng Trade Co., Ltd.   

seamless precision pipe /small pipe

Delivery Time 7-13 days Package export standard packing Supply Ability 150000 Ton per Month Minimum Order Quantity 25 Kilogram Payment Terms D/P,T/T,Western Union,MoneyGram,alipay Port shenzhen Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of

Shenzhen Hong Tian Metal Products Co., Ltd.