Searching erw , total 1840 products,queries done in 19 ms

GI PIPE

Delivery Time base on your order Package small size packed by metal strips into bundles, big size in bulk made from galvanized steel or bulk shipment Supply Ability 72000 Metric Ton per Year Minimum Order Quantity 15 Metric Ton Payment Terms L/C,T/T Port XINGANG PORT Fob Price US

Tianjin Taiyixin Steel Tube Manufacturing Co., Ltd.   

gi pipe

Delivery Time 30 days Package exporting standard package Supply Ability 400000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms T/T Port Tianjin Fob Price US$600-900Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin Zhejia

Tianjin Hengji Steel Co., Ltd.   

tube

Delivery Time 60 days Package bundles Supply Ability 300000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port Qingdao, Tianjin Fob Price US$500-1000Qingdao, Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Origin Sh

Weifang East Steel Pipe Co., Ltd.   

square tube

Delivery Time 25-45 days Package bundle, as your requirement Supply Ability 400 Ton per Week n/a Minimum Order Quantity 20 Ton n/a Payment Terms L/C,T/T Port Tianjin Fob Price US$650-800Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Boiler Pipe Place of

Beijing Xinyinghengtong Metal Products Co., Ltd.   

Hot Dipped Galvanized Steel Pipe

Delivery Time In 20-30 days after get advance payment or LC Package Hexagon bundle with waterproof packing Supply Ability 2000 Ton per Month Minimum Order Quantity 5 Ton Payment Terms L/C,D/P,T/T Port Xingang,Tianjin Port Fob Price US$650-820Xingang,Tianjin Port Secondary Or Not

Yanshan Yutong Steel Pipe Co., Ltd.   

scaffold pipe

Delivery Time 15-45DAYS Package PACKED IN BUNDLE Supply Ability 5000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port XINGANG PORT Fob Price US$500-900XINGANG PORT Technique Hot Rolled Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy

Sanli Industry Co., Ltd.   

Pre galvanized pipe(Made by galvanized steel strip)

Delivery Time 15~30 days after receive your deposits. Package Our products can be packaged in bulk, bundles, or PVC. Supply Ability 5000 Metric Ton per Month special orders we can do as customers'requests. Minimum Order Quantity 5 Metric Ton according our production ability and s

Efya International Imp. & Exp. Co., Ltd.   

steel pipe

Delivery Time within 7 days or customer requirement Package 1. PP2. PE3. Bundle4. caps both ends5. according to customer requirement All for customer and all for customer benifit Supply Ability 25 Ton per Day Minimum Order Quantity 25 Ton Payment Terms L/C,T/T Port Qingdao/tianji

Liaocheng Xinhaifeng Steel Pipe Manufacturing Co., Ltd. (Development Zone)   

welded steel pipe

Delivery Time 16 days after order Package 1.Big OD in bulk 2.Samll OD packed by steel strips 3.Woven cloth with slats 4.According to the requirements of customers Supply Ability 120 Ton per Day Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port tianjin Fob Price US$699-799t

SINO EAST STEEL ENTERPRISE CO., LTD.   

astm a53 erw pipe

Delivery Time delivery timely Package in bulk or in container Supply Ability 200000 Ton per Year Minimum Order Quantity 200 Ton Payment Terms L/C,T/T Port xingang Fob Price US$600-700xingang Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Fluid Pipe Place of Ori

Hebei Zhongyuan Steel Pipe Manufacturing Co., Ltd.   

big diameter ERW steel pipes

Delivery Time 20days Package in bundles Supply Ability 5000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T,Western Union Port qingndao Fob Price US$10-100qingndao Special Pipe Thick Wall Pipe Section Shape Round Application Boiler Pipe Place of Origin China (Ma

Liaocheng Tianrui Steel Tube Co., Ltd.   

packed tube

Package packing by belt or by nylon. Supply Ability 1000 Ton per Month Minimum Order Quantity 55 Ton Payment Terms L/C,T/T Port shanghai Fob Price US$500-800shanghai Certification CE Special Pipe API Pipe Section Shape Square Secondary Or Not Non-secondary Alloy Or Not Non-alloy

Hankou Roll-Forming Steel Plant Of WISCO   

Electrical Conduit 25

Delivery Time 15 to 30 days,according to your PO. Package Bundle,tied with wires,covered with woven bag. Supply Ability 1000 Ton per Month Minimum Order Quantity 20 Ton 5 ton per size Payment Terms L/C,T/T Port Shanghai Fob Price US$2.08-3.60Shanghai Secondary Or Not Non-secondar

Zhangjiagang Yihuatong Metal Material Co., Ltd.   

Welded Steel Pipe

Delivery Time within 45 days Package steel package and sea worthy Supply Ability 40000 Metric Ton per Month Minimum Order Quantity 5 Ton or as client's requirement Payment Terms L/C,T/T Port Tianjin or Shanghai Fob Price US$500-900Tianjin or Shanghai Secondary Or Not Non-secondar

Qingdao Noble International Co., Ltd.   

Round Pipe

Delivery Time Usually Within 15 Days After the Receipt of Deposit or L/C Package By Bundles with Export Package Standard or According to the Requirement Supply Ability 10,000.00 Metric Ton per Month Minimum Order Quantity 10.00 Metric Ton Payment Terms L/C,T/T Port Tianjin Port S

Tianjin Sincere Import & Export Co.,Ltd.   

ASTM A53 seamless pipe , welded hot-dipping galvanized tubes and seamless nominal-size tubes

Delivery Time within 30 days Payment Terms L/C,T/T,Western Union,MoneyGram Technique Seamless Type Seamless Technique Hot Rolled Surface Treatment Other Section Shape Square Place of Origin China (Mainland) Standard ASME, ANSI Technique Seamless Type Seamless Technique Hot Rolled

Shanghai Yichen Industrial Co., Ltd.   

ERW Welded Black Circular Pipe For Construction and Furniture Use

Delivery Time Within 20 days after receipt of L/C Supply Ability 10,000MT/month Minimum Order Quantity 100MT Payment Terms L/C, T/T, D/P Technique Welded Certification ISO9001, ISO14001 Brand Name steellux Model Number TU 0070 Technique ERW Place of Origin China Grade Q195 Standa

Lianyungang Timber United Industry Holding (Group) Corp., Ltd.   

hollow section

Delivery Time 15-30 days after recieve the LC or pre-paid Package Bundles,seaworthy wooden cases with or withoutedge protector, steel hoop and seals, or as percustomers' requirements Supply Ability 6000 Ton per Month Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port Tianjin

Tianjin Lode Import & Export Co., Ltd.   

galvanized steel pipe

Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Guangdong China (Mainland) Thickness 2.0mm~5.00mm Outer Diameter DN15~DN300 Grade Q195, Q215, Q235 Standard BS, GB Thickness 1.0mm~9.mm Outer Diameter 21.3mm~355.6mm Grade Q235, Q215,

Guangzhou Pearl River Galvanizing Steel Pipe Works   

welded pipe/ASTMA53 pipa/API pipe/JIS steel pipe

Delivery Time depend on your demand Package in bundle Supply Ability 1000 Ton per Month Minimum Order Quantity 1 Ton Payment Terms L/C,D/A Certification API Section Shape Round Application Oil Pipe Place of Origin China (Mainland) Thickness SCH10-SCH160 Outer Diameter DN10-DN700

Cangzhou Tianyi Pipeline Co., Ltd.