Searching delivery time , total 579329 products,queries done in 249 ms
Forging parts

Delivery Time 10days Package 88000PCS per 20GP 4000PCS per wooden case, outer size 750*700*600mm G W. 950KGS150PCS per carton, outer size 420*360*120mm G W. 35KGS Supply Ability 100000 Piece/Pieces per Month Minimum Order Quantity 1000 Piece/Pieces Payment Terms L/C,T/T Material

Beyond Metallic Products Co., Ltd.   

Vertical Capstan

Delivery Time 10 days Minimum Order Quantity 1 Piece/Pieces Payment Terms L/C,T/T Model Number SM-HVC5/380 Brand Name Sinma Place of Origin China Model Number SM-HVC5/380 Brand Name Sinma Place of Origin China hydraulic vertical capston Specifications 1) Model with capacity from

Xuzhou Sinma Machinery Co., Ltd   

Front Idler,idler roller,idler group

Delivery Time 30days Package pallet Supply Ability 10000 Piece/Pieces per Month Minimum Order Quantity 1 Piece/Pieces Payment Terms L/C,T/T Port XIAMEN Fob Price US$0-400XIAMEN Model Number PC400 Brand Name JTF Place of Origin Fujian China (Mainland) Model Number PC400 Brand Name

machining castings

Delivery Time 30 days Package in cartons, palletized. Supply Ability 500 Ton per Month Minimum Order Quantity 1 Ton Payment Terms L/C,D/P,T/T Material Iron Place of Origin China (Mainland) Material Iron Place of Origin China (Mainland) iron castings with machining, CNC & cumperiz

Tianjin Sun Metals Inc.   

Supply stainless steel ball

Delivery Time 15 days Package packing boxes Supply Ability 10 Ton per Week Minimum Order Quantity 1 Ton Payment Terms L/C,T/T Material Steel Brand Name Huaxing Place of Origin Zhejiang China (Mainland) Material Steel Brand Name Huaxing Place of Origin Zhejiang China (Mainland) 42

Shangyu City Yehua Industrial Co., Ltd.   

Hot forging,forging,forging parts

Delivery Time WITHIN 30 DAYS Package Woody box,Fiberboard box, Steel box,Paper box,as customers'requirements Supply Ability 200 Ton per Month Payment Terms L/C,T/T Certification ISO9001 Certification ISO9001 Different kinds of forging part. We can product it as coustomers drawing

Zhangjiagang Shunkang Hardware Manufacturing Co., Ltd.   

CFC Top Heat Shield for Crystal Growing of Silicon

Delivery Time in 45 working days Package packed in wooden cases Supply Ability 10 Ton per Month Minimum Order Quantity 5 Set/Sets Payment Terms D/P CFC Heat Shield Crystal Growing of Silicon Carbon-Carbon Composite Model Number 18-28 Brand Name Boyun Place of Origin Hunan China (

Hunan Nanfang Boyun Novel Material Co., Ltd.   

EMT Fittings EMT Accessories

Delivery Time 20-30days Package Carton Box Supply Ability 500000 Piece/Pieces per Month Minimum Order Quantity 3000 Piece/Pieces Payment Terms L/C,T/T Port Shanghai Fob Price US$0.05-5.0Shanghai Usage Electrical Wiring Specification 1/2" to 4" Material Steel Model Number IMC Plac

Hangzhou Prostar Enterprises Ltd.   

Volute of slurry pump

Delivery Time 20-30 Package Wooden case Supply Ability 2000 Piece/Pieces per Year Minimum Order Quantity 1 Piece/Pieces Payment Terms L/C,T/T Certificaton ISO9001 Brand Name Battle Max Place of Origin Hebei China (Mainland) Certificaton ISO9001 Brand Name Battle Max Place of Orig

Shijiazhuang Hengchang Industry Pump Enterprise Co., Ltd.   

Inverted Bucket Steam Traps

Delivery Time 30 days Supply Ability 500pcs/month Minimum Order Quantity 5pcs Payment Terms T/T, L/C Certification ISO9001 Material Steel Model Number 881 Brand Name LONZ Place of Origin China Certification ISO9001 Material Steel Model Number 881 Brand Name LONZ Place of Origin C

Zhejiang Longcheng Valve Co., Ltd.   

Forged square steel bar of 42CrMo

Supply Ability 2000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port Shanghai Material Steel Brand Name wuxi Qianfeng Place of Origin Jiangsu China (Mainland) Material Steel Brand Name wuxi Qianfeng Place of Origin Jiangsu China (Mainland) Steelmaking+Hot fo

Wuxi Qianfeng Forging Co., Ltd.   

Shock Absorber

Delivery Time within 15days Package carton and pallet Supply Ability 50,000 Piece/Pieces per Month Minimum Order Quantity 1000 Piece/Pieces Payment Terms T/T,MoneyGram Port Ningbo Place of Origin Zhejiang China (Mainland) Place of Origin Zhejiang China (Mainland) We are a leading

Yuyao Kebang Powder Metallurgy Co., Ltd.   

Rough Machining Parts

Delivery Time 35 days Supply Ability 700 Metric Ton per Month Minimum Order Quantity 20 Metric Ton Payment Terms L/C,T/T Port Shanghai Fob Price US$250-1000Shanghai Certification ISO9000 Material Steel Place of Origin Jiangsu China (Mainland) Certification ISO9000 Material Steel

Wuxi Excellence Forging Co., Ltd.   

Investment casting

Delivery Time 30-40 days after orders placed Package Inner packing plastic pouch,boxOuter packing Carton(114x114x114)and Iron plate Supply Ability 100 Ton per Month Minimum Order Quantity 2000 Piece/Pieces Payment Terms T/T material stainless steel,carbon steel Material Steel Pla

Gaoming Ligang Precision Casting Co., Ltd.   

Gravity Casting 469

Delivery Time one-two month Package according to customers' requirements Supply Ability 10000000 Piece/Pieces per Month Minimum Order Quantity 2000 Piece/Pieces Payment Terms L/C,D/A,D/P,T/T Material Aluminum Place of Origin Jiangsu China (Mainland) Material Aluminum Place of Ori

Dongguan Fuhai Metal & Machine Co., Ltd.   

high manganese steel casting

Delivery Time 15 days Package un-fumigating wooden tray Supply Ability 300 Ton per Month Minimum Order Quantity 100 Kilogram Payment Terms L/C Port Tsingdao high manganese steel casting high manganese steel casting Material Steel Place of Origin Shandong China (Mainland) high man

Qingdao Nanyang Sancheng Machinery Co., Ltd.   

forging

Delivery Time 45days Package Wooden Case, Veneer Board Case Supply Ability 2000 Ton per Month Minimum Order Quantity 2 Ton Payment Terms L/C,D/P,T/T,Western Union Port Qingdao/Tianjin/Ningbo Material Steel Brand Name RoadE Place of Origin China (Mainland) Material Steel Brand Nam

Qingdao Roadeast General Parts Co., Ltd.   

aluminum sand casting parts

Payment Terms L/C,T/T Material Aluminum Material Aluminum aluminum sand casting parts Architectural decoration supplies. Finish machining,heat treatment,surface treatment. Our main customers come from the United States and Europe Delivery Time Within 14 days after receiving order

Shanghai Consummation Industry Co., Ltd.   

Lightbox stand parts

Delivery Time within 30days after receiving order Package as per your required Minimum Order Quantity 500 Piece/Pieces Payment Terms L/C,T/T Port Ningbo/Shanghai Place of Origin China (Mainland) Place of Origin China (Mainland) Product Name lightbox stand parts Price Terms FOB Ni

Zhejiang Pipe Auto Parts Co., Ltd.   

AUTO PARTS

Delivery Time 50-60 DAYS Supply Ability 400000 Piece/Pieces per Month Minimum Order Quantity 1000 Piece/Pieces Payment Terms T/T Port FOB SHANGHAI Place of Origin CHINA Place of Origin CHINA WE HAVE PRODUCED AUTO PARTS FOR MORE THAN 15 YEARS.

Wenzhou Keda Automobile Bearing Co., Ltd.