Delivery Time 20-30 days Package In bulk or colour box. Supply Ability 1,000,000 Dozen per Month Minimum Order Quantity 300 Dozen Payment Terms L/C,D/P,T/T,Western Union Port SHANGHAI Brand Name MOFIX Place of Origin China (Mainland) Brand Name MOFIX Place of Origin China (Mainla
Delivery Time 30 days after received payment Package plastic bags then carton packing,or as customers' request Payment Terms L/C,T/T Port Qingdao Material Metal Usage Pipe Clamp Place of Origin Shandong China (Mainland) Material Metal Usage Pipe Clamp Place of Origin Shandong Chi
Delivery Time within 30 days. Package wood or carton package as per your demand Supply Ability 360 Ton per Month Minimum Order Quantity 1000 Piece/Pieces Payment Terms T/T Port QingDao Fob Price US$0.1-100QingDao strain clamp strain clamp Standard or Nonstandard Standard Structur
Delivery Time 15days Supply Ability 80 Ton per Month Model Number L6006 Brand Name Lostwax Place of Origin Shandong China (Mainland) Model Number L6006 Brand Name Lostwax Place of Origin Shandong China (Mainland) spider, glass clamps construction hardware, architectural hardware,
Payment Terms T/T Port Ningbo Material Metal Usage Heavy Duty Brand Name siwode Place of Origin China (Mainland) Material Metal Usage Heavy Duty Brand Name siwode Place of Origin China (Mainland) QTC oil clamp 1.Applicable to the oil's vertical lifting 2.loading range 0-0.5tons.
Delivery Time 30 - 45 days Package Gunny bag or carton box in pallet Supply Ability 200 Piece/Pieces per Month Minimum Order Quantity 100 Piece/Pieces Payment Terms L/C,T/T Port QINGDAO/SHANGHAI Standard or Nonstandard Standard Structure Saddle Clamp Material Metal Usage Heavy Du
Delivery Time within 3 weeks Package Carton(35*35*21cm) / Pallet(110*110cm) Supply Ability 50000 Set/Sets per Week Minimum Order Quantity 100 Set/Sets Payment Terms T/T Port Shanghai Fob Price US$1-600Shanghai Standard or Nonstandard Standard Structure Assembly Material Aluminium
Structure G Clamp Material Metal Usage C Clamp Model Number DFCC Place of Origin Shanghai China (Mainland) Structure G Clamp Material Metal Usage C Clamp Model Number DFCC Place of Origin Shanghai China (Mainland) Drop forged C45 Steel Frame, Powder Coated With Heat Treatment Car
Delivery Time 20 DAYS Package CERTAIN PCS IN POLY BAG,CERTAIN POLY BAGS IN MASTER CARTON,special package also be made Supply Ability 200000 Piece/Pieces per Day Minimum Order Quantity 10000 Piece/Pieces Payment Terms L/C,T/T,Western Union Port TIANJIN white yellow Standard or Non
finish zinc plated material carbon steel/stainless steel finish zinc plated material carbon steel/stainless steel Features 1) Available in stainless steel 2) Other sizes on special order are available 3)Clamps are manufactured from cold-rolled low-carbon steel with galvanized fin
Delivery Time According to your order. Package packed in plastic bags and then in different sizes of cartens according to your requirement. Supply Ability 1,000,000 Piece/Pieces per Month Minimum Order Quantity 10,000 Piece/Pieces Payment Terms L/C,T/T Port Ningbo & Shanghai widt
SIZE RANGE 1/2 inch thru 24 inches SIZE RANGE 1/2 inch thru 24 inches MATERIAL Carbon steel FINISH Black or galvanized; furnished black unless otherwise specified. SERVICE Recommended for suspension of cold or hot pipe lines where little or no insulation is required. MAX. TEMP. 7
Manufactured in Carbon Steel (11mm band width) All components are made from high grade carbon steel, zinc plated and clear chromate passivated.
Available in both zinc plated carbon steel and Stainless Steel AISI304, and diameters 17mm to 252 mm. This classic design has w Available in both zinc plated carbon steel and Stainless Steel AISI304, and diameters 17mm to 252 mm. This classic design has widespread applications in
Standard or Nonstandard Standard Structure Spring Clamp Material Metal Usage Pipe Clamp Model Number none Brand Name NKS Place of Origin Taiwan Standard or Nonstandard Standard Structure Spring Clamp Material Metal Usage Pipe Clamp Model Number none Brand Name NKS Place of Origin
KYUNG SIN NO.8 WATER PIPE HOLD CLAMP DIMENSIONS(inches) the pipe throgh which water flows down from a waterspout on a roof. SERVICE Clamp is designed to hold FINISH Electro galvanized. MATERIAL Carbon steel. SIZE RANGE ?through 18inch. KYUNG SIN NO.8 WATER PIPE HOLD CLAMP
Delivery Time within 40 days after receiving an irrevocable L/C Package export standard packing Supply Ability 1000 Set/Sets per Day Minimum Order Quantity 5000 Set/Sets Payment Terms L/C,T/T Port INCHEON Reasonable price wide utility Standard or Nonstandard Other Structure Other
Place of Origin Zhejiang China (Mainland) Place of Origin Zhejiang China (Mainland) Sell pipe clamp double ring We can meet any your request about the products' structure,please contact us if you want to know more,we will reply as soon as possible. 7)We also supply single/double
Place of Origin China (Mainland) Place of Origin China (Mainland) Stainless Steel with Carbon Steel Screw + Rubber Pad
Standard or Nonstandard Standard Structure F Clamp Material Metal Usage Other Model Number 1607.XXXXX Place of Origin China (Mainland) Standard or Nonstandard Standard Structure F Clamp Material Metal Usage Other Model Number 1607.XXXXX Place of Origin China (Mainland) German typ