alpha:e* - Manufacturers, Suppliers & Exporters

Total 175030 products found
ERW square steel pipe used in cranes

Delivery Time 15-30days Package wrapped with strong steel strips Supply Ability 4500 Ton per Month Minimum Order Quantity 25 Ton Payment Terms L/C,T/T Port Tianjin Certification CSS Section Shape Rectangular Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Struct

Hebei Xinzhonglian Special Steel Tube Co., Ltd.   

ERW Steel Pipes/ welded pipes

Delivery Time 20days after received TT down payment or LC Package bundles Supply Ability 10000 Ton per Month Minimum Order Quantity 25 Ton Payment Terms L/C,T/T,Western Union Port XINGANG PORT, CHINA Fob Price US$450-800XINGANG PORT, CHINA Welding Line Type ERW Model Number hmst-

Tianjin Hanmusite Metal Material Co., Ltd.   

Erw Tube

Technique Welded Brand Name Q195,Q215,Q235 Technique ERW Place of Origin Tianjin China (Mainland) Grade Q195 Standard GB Technique Welded Brand Name Q195,Q215,Q235 Technique ERW Place of Origin Tianjin China (Mainland) Grade Q195 Standard GB Erw Tube MATERIAL GB SATANDARD GRADE Q

Tianjin Goldensun Import&Export Co., Ltd.   

ERW square tube

Delivery Time as per your quanties Package in bundle or as per your instructions. Supply Ability 300,000 Ton per Year Minimum Order Quantity 50 Ton Payment Terms L/C,D/P,T/T Port ningbo shanghai Fob Price US$630-680ningbo shanghai Length 60x40mm~500x300mm Technique ERW Section Sh

Zhejiang Yongjie Industry Co., Ltd.   

ERW STEEL PIPE

Package AS CUSTOMERS' REQUIREMENTS Supply Ability 700 Ton per Week Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port QINGDAO Welding Line Type ERW Technique Welded Technique ERW Secondary Or Not Is Secondary Place of Origin Shandong China (Mainland) Standard GB Welding Lin

Liaocheng City Weiye Steel Pipes Co., Ltd.   

EMT CONDUIT,electrical conduit

Delivery Time 25-30 days Package carton Supply Ability 50000 Piece/Pieces per Month Minimum Order Quantity 500 Piece/Pieces Payment Terms L/C,T/T,Western Union Port SHANGHAI/NINGBO Surface Treatment Galvanized Special Pipe EMT Pipe Section Shape Round Secondary Or Not Non-seconda

Hangzhou YOYA Electrical Co., Ltd.   

Seamless Tube EN 10224

Delivery Time 45 days Package In bundle,wooden cases,non woven cloth or bags,or as required. Supply Ability 1,380.00 Metric Ton per Year Minimum Order Quantity 10 Metric Ton Payment Terms L/C,T/T Port Tianjin Fob Price US$680.00-1,380.00Tianjin Type Seamless Secondary Or Not Non-

Beijing Topensea International Trade Co., Ltd.   

ERW welded steel pipe

Supply Ability 150,000 Metric Ton per Year Payment Terms L/C Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Gas Pipe Place of Origin Liaoning China (Mainland) Thickness 3.5-12mm Outer Diameter 73-426mm Grade A53B, API J55, Q235, Q345 Standard BS, JIS, GB, DIN,

Haicheng Northern Steel Pipe Anti-Corrosion Co., Ltd.   

emt conduit/galvanized pipe

Delivery Time 60 days Package bundles Supply Ability 40000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port Qingdao, Tianjin Fob Price US$500-1000Qingdao, Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin

Weifang East Steel Pipe Co., Ltd.   

High Pressure Oil Tubes for Diesel Engine

Delivery Time 30-60 days Package internal wrapped with plastic foil,external wrapped withP E.packed in seaworthy wooden cases Supply Ability 100 Ton per Month Minimum Order Quantity 2 Ton Payment Terms L/C,T/T Port Shanghai Fob Price EUR1000-3000Shanghai Usage oil tubes for diese

Zhangjiagang Huadian Import & Export Co., Ltd.   

ERW steel tube

Delivery Time 30 days Package exporting standard package Supply Ability 400000 Ton per Year Minimum Order Quantity 25 Ton Payment Terms T/T Port Tianjin Fob Price US$600-800Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Gas Pipe Place of Origin Tianjin

Tianjin Hengji Steel Co., Ltd.   

EN 10025 carbon pipe

Delivery Time 10-20days Package standard export packing Supply Ability 8000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T,Western Union Port qingdao Fob Price US$10-100qingdao Section Shape round/square/rectangular Alloy Or Not Is Alloy Application Fluid Pipe

Liaocheng Tianrui Steel Tube Co., Ltd.   

EMT pipe 3/4"

Delivery Time 15 to 35 days,according to per PO. Package Small package,20pcs/bundle,tied with wires Master package,20pcs/small bundle,tied with wires,then 50small bundles/master,tied with steel straps Each bundle covered with woven bag. Supply Ability 800 Ton per Month 5 Ton per

Zhangjiagang Yihuatong Metal Material Co., Ltd.   

API 5D E75/ X95/G105/S135

Delivery Time depend on quantity Package blank painted,end caps. bundled. Supply Ability 100 Ton per Month Minimum Order Quantity 5 Ton Payment Terms L/C,D/A,D/P,T/T Port tianjin Fob Price US$29400-42600tianjin Model Number E75, X95, G105, S135 Technique Seamless packing normal e

Tianjin Jinxin Steel Trading Co.,ltd.   

EP tube

Delivery Time 15 Package inner capped and baggedout crate Supply Ability 10000 Meter per Month Minimum Order Quantity 500 Meter Payment Terms L/C,T/T Port shanghai Fob Price US$0-30shanghai Type Seamless Technique Cold Rolled Certification ISO Application Gas Pipe Place of Origin

Jiang Su Chuang Yue Metal Industry Co., Ltd.   

EMT pipe(UL797/UL6)

Delivery Time 60days Package bundles Supply Ability 300000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Port mainland Fob Price US$500-1000mainland Special Pipe EMT Pipe Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Place of Origin

Shanghai Sonitic Steel Trading Co., Ltd.   

erw pipe

Delivery Time 25-30days Package in bundles or according to the clients' requirements Supply Ability 200000 Ton per Year Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port Tianjin Fob Price US$500-800Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Oi

Cangzhou Northsteel Co., Ltd.   

ERW Steel Pipe

Supply Ability 9000 Piece/Pieces per Month Minimum Order Quantity 1 Piece/Pieces Payment Terms L/C,D/P,T/T Section Shape Square Secondary Or Not Is Secondary Alloy Or Not Non-alloy Application Gas Pipe Place of Origin Shandong China (Mainland) Thickness OTHER Outer Diameter OTHER

Jinan Kinger Pipeline Corp.   

erw black pipe

Delivery Time 20-30days Package 1,Big OD in bulk2,Small OD packed by steel strips 3,As per to client. Supply Ability 5000 Ton per Month Minimum Order Quantity 25 Ton Payment Terms L/C,T/T Port Xingang Fob Price US$400-800Xingang Special Pipe Thick Wall Pipe Section Shape Round Se

Tianjin Qunshengda Steel Pipe Co., Ltd.   

ERW carbon steel pipe and tube

Delivery Time 7 days after confirm Package weave bag packing,beveled ends Supply Ability 50000 Ton per Month Minimum Order Quantity 50 Ton Payment Terms L/C,T/T,Western Union Port tianjin Fob Price US$500-700tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Applicatio

Cangzhou Datang Steel Pipe Co., Ltd.