Searching Cover , total 46949 products,queries done in 19 ms
Cold Drawn Seamless Circular Tubes

Delivery Time 30 days Package sea-worthy package Supply Ability 1600 Ton per Month 16,000MT/year Minimum Order Quantity 5 Ton 2MT Payment Terms L/C,D/P,T/T Port shang hai Model No PD0122 Brand Name Da Peng Technique Seamless Technique Cold Drawn Secondary Or Not Non-secondary Pla

Anji Pengda Steel Pipe Co., Ltd.   

API steel pipe

Delivery Time within 45 days after receiving down payment or L/C Package plastic hats cover two ends tied in bundles by steel strips and paint on the pipe./ Paint Varnish Coating, Plastic Caps and mark on the pipe/ Bundle packing stacking or other ways as our customers required S

Tianjin Pengxin Weiye Iron & Steel Trade Co., Ltd.   

seamless rectangular pipe

Delivery Time 3-15days Package wrapped with steel stripsIn bundle and proof cover loading into 20'FCL/40'FCL 5.89m*2.33m*2.38m 22MTS 28CBM/12.02m*2.33m*23.8 26MTS 58CBM or as customers' requirement Supply Ability 100000 Ton per Month production canpacity is well Minimum Order Qua

Tianjin Guangxin Iron and Steel Industrial & Trading Co., Ltd.   

ASTM A53 pipe

Delivery Time 20days -30days Package Plastic hats cover two ends; Tied in bundles by steel strips for the convenience of long distance transportation. Supply Ability 30000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T,Western Union Type astm Specification A53A

Shandong Liaocheng ZGL Metal Manufacturing Co., Ltd.   

carbon steel pipe

Delivery Time One month or two months, decide according to goods how many Package (1)Plastic hats cover two ends tied in bundles by steel strips and paint on the pipe.(2)Paint Varnish Coating, Plastic Caps and mark on the pipe(3)Bundle packing Supply Ability 400 Ton per Day Minim

Shandong Liaocheng Luxi Metal Materials Co., Ltd.   

Line Pipe

Delivery Time 30 days Package Plastic hats cover two ends;Tied in bundles by steel strips for the convenience of long distance transportation. Supply Ability 1000 Ton per Month Minimum Order Quantity 40 Ton Payment Terms L/C,T/T,Western Union Special Pipe API Pipe Section Shape R

Shandong Zhongzheng Steel Pipe Manufacturing Co., Ltd.   

Sell Hot Dipped Galvanized Welded Round Pipe

Technique Welded Surface Treatment Galvanized Section Shape Round Technique Welded Surface Treatment Galvanized Section Shape Round We are pleased to introduce you ourselves who are specialized in hot DIP galvanized welded steel rou We are pleased to introduce you ourselves who a

Future Korea Corporation   

RAGE WATER SPORTS TRIPLE TUBE PACK BLUE

Super Tough Water Proof Outer Cover Super Tough Water Proof Outer Cover Four Comfy Grip EVA filled Handles 30 Gauge PVC Inner Tube Boston & Standard Inflation Valve Water Drain & ReinforcedTow Point With Quick Connect Product Description3 x 56" Rage Water Sports "TYPHOON" Tubes 3

Rage Water Sports   

Tube

The top body folded inward in smooth shape Type and structure Tubes and ovals with or without specially-designed blossoming top. Combine with the cover, body and bottom. The top body folded inward in smooth shape. The cover can be removed and the bottom is glued and firm.

LEE MING MANUFACTURING LTD   

Corrugated Steel Pipe

Secondary Or Not Is Secondary Secondary Or Not Is Secondary For water flow and drainage For water flow and drainage It is used in drainpipe of housing area and industrial complex and the road, railway, vertical drainpipe and cross drainpipe, factory drainage way, temporary waterw

DONG WON STEEL CO.,LTD   

concrete pipes

Section Shape Round Secondary Or Not Is Secondary Section Shape Round Secondary Or Not Is Secondary Humes Australian developed Hume spun concrete pipes are used around the world since 1926. Humes Australian developed Hume spun concrete pipes are used around the world since 1926.

GARUD HUME PIPES   

Standard Square Lock Tube

Section Shape Square Secondary Or Not Is Secondary Section Shape Square Secondary Or Not Is Secondary Material Stainless Steel / Galvanized Steel Applications Protection of power cable and wire which are widely used in different areas, such as building, machines, elevators, secur

Kaiphone Technology Co., Ltd   

Conduit - PWR PVC Wire Rein Force Flexible Conduit

Welded Line Type Spiral Welded Line Type Spiral Application Cover and protection of electrical cables and optic fibers. PWR PVC Wire Rein Force Flexible Conduit Application Cover and protection of electrical cables and optic fibers. Properties Flexible PVC hose, reinforced with a

FLEX TUBES   

Seamless Pipe

Standard ASME Standard ASME Seamless Pipe Out of roundness Difference between maximum & minimum OD% Straightness 3 mm in 3 mtrs. Length As per customeer specification. Thickness Minimum thickness at any point not more than 0.3 mm under nominal Thick. Class 1 Double side welded us

M.M. METALS   

Fuel hoses

Delivery Time 10 days Package in cartons Supply Ability 50000 Meter per Month Minimum Order Quantity 50 Meter Payment Terms L/C,T/T Port Shanghai Fob Price US$0.8Shanghai Specification 2.0~50mm Brand Name Zhiyan Technique Seamless Technique Extruded Secondary Or Not Is Secondary

Jiangyin Huanyu Rubber & Plastic Co., Ltd.   

fire resistant hose

Delivery Time 10-20 days after order confirmation Package plastic films, then wrapped with fabrics Supply Ability 100000 Meter per Month Minimum Order Quantity 10 Meter Payment Terms L/C,T/T Port tianjin Fob Price US$0.1-100tianjin color red or black Usage high temperature surrou

Hebei Dingli Rubber Product Co., Ltd.   

Steel Wire Braided Hydraulic Hose (DIN-2SN)

Delivery Time within 20 days Package packed in hessian clothes or plastic Supply Ability 1000000 Meter per Month Minimum Order Quantity 200 Meter Payment Terms L/C,T/T,Western Union Port Tianjin Port, China Fob Price US$0.89-21.98Tianjin Port, China Secondary Or Not Non-secondary

Hengshui Zhongbo Imp. and Exp. Co., Ltd.   

Cold Drawn Seamless Ellipsoidal Tube

Delivery Time 30 days Supply Ability 16,000MT/year Minimum Order Quantity 2MT Payment Terms irrevocable L/C at sight, T/T 30% deposit, 70% against the copy Model No PD008-1 Brand Name Da Peng Technique Seamless Technique Cold Drawn Place of Origin China Standard GB Model No PD008

Anji Pengda Steel Pipe Co., Ltd.   

square steel tubes

Delivery Time within 15-45days after recieving deposite or LC Package in bundles or with cover as required by customer Supply Ability 10000 Ton per Month Minimum Order Quantity 25 Ton Payment Terms L/C,T/T Port TIANJIN PORT Fob Price US$500-650TIANJIN PORT Secondary Or Not Non-se

Tianjin Junfeng Steel Trade Co., Ltd.   

seamless carbon steel tube ASTM A106-B A53-B

Delivery Time If storage, 30 days. If not storage, 45 days. Package (1)Plastic hats cover two ends tied in bundles by steel strips and paint on the pipe.(2)Paint Varnish Coating, Plastic Caps and mark on the pipe(3)Bundle packing Supply Ability 1000 Ton per Day Minimum Order Quan

Shandong Liaocheng Luxi Metal Materials Co., Ltd.